The effectiveness of the implementation of CIPAA 2012 in alleviating the payment ills of Malaysia construction industry
Some expert has doubted the effectiveness of CIPAA 2012 in relieving the payment problems in the industry as most of the court decisions were held in favour of the non-paying party preceded by the escalation of adjudication generated litigation cases as well as the presence of inconsistencies of the...
Saved in:
Main Author: | Cheah, Siok Teng |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/85785/1/CheahSiokTengMFABU2019.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Interpretation dilemma: payment response in CIPAA 2012
by: Mohd. Bashah, Imee Nurshafinaz
Published: (2016) -
Profile of construction payment dispute
by: Ooi, Poh Poh
Published: (2010) -
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009) -
Issues in implementing electronic tendering in Indonesian’s construction industry
by: Ratih Kusumawati, Ratih Kusumawati
Published: (2012) -
Adjudicator determines own jurisdiction: a prediction for the proposed construction industry payment and adjudication act
by: Mohd. Yusop, Imran
Published: (2010)