Logistic management in industrialized building system
The Industrialized Building System (IBS) is a building technique where the construction date can be shortened because IBS components and framework are made from the factory. Nevertheless, the problem lies in implementing IBS by moving materials and structure to the construction site. The IBS '...
Saved in:
Main Author: | Mohamed, Masarizan |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/85928/1/MasarizanMohamedMSKA2020.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Industrialized building system value management by using building information modeling
by: M.Baqer, Hasanain M.Ridha
Published: (2014) -
Life cycle costing of industrialized building system and conventional building system
by: Al-Attabi, Ali Mohammed Ali Naji
Published: (2014) -
The management of industrialized building systems (ibs) projects using radio-frequency identification (rfid) technology
by: Jamal, Muhammad Adib
Published: (2019) -
Post tensioning effect in column to beams by bolts of Industrialized Building System (IBS) for school buildings
by: Qader Mustafa, Hewa
Published: (2014) -
Enhancing building information modelling implementation in delay management in Malaysian construction industry
by: Gunasekgerin, Hemaambigey
Published: (2021)