Enforceability of the liquidated and ascertained damages and effect of section 75 contracts ACT 1950
The usual redress awarded to the employer in the event of a breach of contract due to late completion will be in the form of liquidated damages. Liquidated damages, or commonly known as Liquidated and Ascertained Damages, abbreviated as ‘LAD’ is sought as the sequel to a non-completion of work. The...
Saved in:
Main Author: | Mohamad, Shazlimanshah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/92717/1/ShazlimanshahMohamadMFABU2019.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Smart contract in Malaysia Construction Industry
by: Mohamad Hidhir, Syarafina Adizah
Published: (2021) -
Interpretation of contracts : admissibility of pre-contractual negotiations
by: Mohamad Khairuddi, Muhammad Khawarizmi
Published: (2019) -
The profile of breaches of contract in construction industry
by: Zainudin, Farah Liyana
Published: (2019) -
Profiling of termination grounds in construction contract
by: Liew, Sock Tin
Published: (2018) -
Validity issues of variation order in construction contracts
by: Mazahar, Norazilan
Published: (2019)