Strategy of minimizing delay in public construction projects through implementation of electronic procurement system

Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this s...

Full description

Saved in:
Bibliographic Details
Main Author: Alwaely, Ammar Mohammed Oda
Format: Thesis
Language:English
Published: 2019
Subjects:
Online Access:http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.92756
record_format uketd_dc
spelling my-utm-ep.927562021-10-28T10:25:27Z Strategy of minimizing delay in public construction projects through implementation of electronic procurement system 2019 Alwaely, Ammar Mohammed Oda TA Engineering (General). Civil engineering (General) Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this study is outline the strategy of minimizing delays through implementation of electronic-procurement system in public construction projects. There are three objectives to achieve this aim. First, determining the relation of procurement systems used with the delay factors. Second, determining the contribution of e-procurement systems in minimizing delays. Third, suggesting an appropriate strategy to assist in carrying out an effective e-procurement system for public construction projects. These objectives were achieved through an intensive literature review and a survey which included a questionnaire used to assess the perceptions of the main participants involved in the construction projects. Interviews conducted with experts to validate the questionnaire form before distributing. The questionnaire was divided into three sections. The main section focused on the causes of delay, which related to procurement system. The 34 causes compiled through the literature review and the interview with experts were classified into four groups according to phase related. Answers collected from 53 respondents representing the parties involved in the construction projects. Data collected was analysed quantitatively and ranked through the Statistical Package for the Social Sciences (SPSS) to identify the significant effects of the procurement system on the delay. It was concluded that the most effective delay factors related to procurement system in Iraq are: the administrative bureaucracy, appointing inexperienced contractors and Incompetent design team, Inadequate early planning, absence of transparency, and limited competition. Finally, appropriate strategic steps identified to carry out an effective e-procurement system in public construction projects. 2019 Thesis http://eprints.utm.my/id/eprint/92756/ http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134378 masters Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering Faculty of Engineering - School of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Alwaely, Ammar Mohammed Oda
Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
description Delays in construction projects have become a common global phenomenon, due to the complex nature of the industry. Iraq is one of the developing countries which faces delay problem in time of urgent need to develop and rebuild the destroyed infrastructure caused by successive wars. The aim of this study is outline the strategy of minimizing delays through implementation of electronic-procurement system in public construction projects. There are three objectives to achieve this aim. First, determining the relation of procurement systems used with the delay factors. Second, determining the contribution of e-procurement systems in minimizing delays. Third, suggesting an appropriate strategy to assist in carrying out an effective e-procurement system for public construction projects. These objectives were achieved through an intensive literature review and a survey which included a questionnaire used to assess the perceptions of the main participants involved in the construction projects. Interviews conducted with experts to validate the questionnaire form before distributing. The questionnaire was divided into three sections. The main section focused on the causes of delay, which related to procurement system. The 34 causes compiled through the literature review and the interview with experts were classified into four groups according to phase related. Answers collected from 53 respondents representing the parties involved in the construction projects. Data collected was analysed quantitatively and ranked through the Statistical Package for the Social Sciences (SPSS) to identify the significant effects of the procurement system on the delay. It was concluded that the most effective delay factors related to procurement system in Iraq are: the administrative bureaucracy, appointing inexperienced contractors and Incompetent design team, Inadequate early planning, absence of transparency, and limited competition. Finally, appropriate strategic steps identified to carry out an effective e-procurement system in public construction projects.
format Thesis
qualification_level Master's degree
author Alwaely, Ammar Mohammed Oda
author_facet Alwaely, Ammar Mohammed Oda
author_sort Alwaely, Ammar Mohammed Oda
title Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_short Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_full Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_fullStr Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_full_unstemmed Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
title_sort strategy of minimizing delay in public construction projects through implementation of electronic procurement system
granting_institution Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering
granting_department Faculty of Engineering - School of Civil Engineering
publishDate 2019
url http://eprints.utm.my/id/eprint/92756/1/AmmarMohammedOdaMSKA2019.pdf
_version_ 1747818609159176192