Improvement measures of cost overruns in residential construction project in Malaysia

Cost overrun is the major issue in residential construction project industry worldwide, including Malaysia. These studies therefore aim to achieve three objectives namely: (1) to identify the existing practice for cost control in residential construction project; (2) to investigate the causes of cos...

Full description

Saved in:
Bibliographic Details
Main Author: Rahim, Nur Syafika Artika
Format: Thesis
Language:English
Published: 2020
Subjects:
Online Access:http://eprints.utm.my/id/eprint/92797/1/NurSyafikaArtikaMSKA2020.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utm-ep.92797
record_format uketd_dc
spelling my-utm-ep.927972021-10-28T10:26:17Z Improvement measures of cost overruns in residential construction project in Malaysia 2020 Rahim, Nur Syafika Artika TA Engineering (General). Civil engineering (General) Cost overrun is the major issue in residential construction project industry worldwide, including Malaysia. These studies therefore aim to achieve three objectives namely: (1) to identify the existing practice for cost control in residential construction project; (2) to investigate the causes of cost overrun in residential construction project in Malaysia; (3) to propose improvement measures on cost overrun in residential construction project in Malaysia. This study was done via of literature review, questionnaire survey and expert focus group for data validation. This study found that: (1) the existing practice shows that the project management team for cost control in residential construction project in Malaysia are the moderate implementation of proper tendering system and bidding process, weak tender committee enforcement on the cost comparison for every contract awarded in a project and no submission of the project cost report to management throughout the project; (2) the cost overrun in residential construction project was causes by improper planning and scheduling, inconsistency in material?s price, incompetent contractor, and poor financial capabilities by contractor; (3) the improvement measures of the cost overrun in residential construction project in Malaysia of which include effective project planning and scheduling, having competent project management teams and using cost-saving construction method in the project. This study could serve as a guideline to the project management team, which involves in Malaysia residential construction project to maximise the cost performance in the project and thus shall support the Construction Industry Transformation Programme Malaysia's national agenda. 2020 Thesis http://eprints.utm.my/id/eprint/92797/ http://eprints.utm.my/id/eprint/92797/1/NurSyafikaArtikaMSKA2020.pdf application/pdf en public http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:134366 masters Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering Faculty of Engineering - School of Civil Engineering
institution Universiti Teknologi Malaysia
collection UTM Institutional Repository
language English
topic TA Engineering (General)
Civil engineering (General)
spellingShingle TA Engineering (General)
Civil engineering (General)
Rahim, Nur Syafika Artika
Improvement measures of cost overruns in residential construction project in Malaysia
description Cost overrun is the major issue in residential construction project industry worldwide, including Malaysia. These studies therefore aim to achieve three objectives namely: (1) to identify the existing practice for cost control in residential construction project; (2) to investigate the causes of cost overrun in residential construction project in Malaysia; (3) to propose improvement measures on cost overrun in residential construction project in Malaysia. This study was done via of literature review, questionnaire survey and expert focus group for data validation. This study found that: (1) the existing practice shows that the project management team for cost control in residential construction project in Malaysia are the moderate implementation of proper tendering system and bidding process, weak tender committee enforcement on the cost comparison for every contract awarded in a project and no submission of the project cost report to management throughout the project; (2) the cost overrun in residential construction project was causes by improper planning and scheduling, inconsistency in material?s price, incompetent contractor, and poor financial capabilities by contractor; (3) the improvement measures of the cost overrun in residential construction project in Malaysia of which include effective project planning and scheduling, having competent project management teams and using cost-saving construction method in the project. This study could serve as a guideline to the project management team, which involves in Malaysia residential construction project to maximise the cost performance in the project and thus shall support the Construction Industry Transformation Programme Malaysia's national agenda.
format Thesis
qualification_level Master's degree
author Rahim, Nur Syafika Artika
author_facet Rahim, Nur Syafika Artika
author_sort Rahim, Nur Syafika Artika
title Improvement measures of cost overruns in residential construction project in Malaysia
title_short Improvement measures of cost overruns in residential construction project in Malaysia
title_full Improvement measures of cost overruns in residential construction project in Malaysia
title_fullStr Improvement measures of cost overruns in residential construction project in Malaysia
title_full_unstemmed Improvement measures of cost overruns in residential construction project in Malaysia
title_sort improvement measures of cost overruns in residential construction project in malaysia
granting_institution Universiti Teknologi Malaysia, Faculty of Engineering - School of Civil Engineering
granting_department Faculty of Engineering - School of Civil Engineering
publishDate 2020
url http://eprints.utm.my/id/eprint/92797/1/NurSyafikaArtikaMSKA2020.pdf
_version_ 1747818611349651456