Factors and impacts of excusable delays in Malaysia engineering, procurement and consturctional projects
Construction project delays remain as global phenomena that attracts research interest of many scholars for decades. Delays caused by internal stakeholders (owner and representatives) and external factors which are beyond contractor‘s control are excusable delays which entitles extension of time wit...
Saved in:
Main Author: | Munusamy, Suresh |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2021
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/99535/1/SureshMunusamyMSKA2021.pdf.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Strategy of minimizing delay in public construction projects through implementation of electronic procurement system
by: Alwaely, Ammar Mohammed Oda
Published: (2019) -
The study on impact of project delay to construction cost
by: Maulana, Dimas
Published: (2011) -
The potential of objective-subjective as project procurement approach
by: Wong, Teck Ing
Published: (2009) -
Traditional Procurement Route Selection Guideline for Construction Projects in Malaysia
by: Tan, Jerren Yun Ping.
Published: (2016) -
The causes of project delay in the ministry of defence, Malaysia
by: Azhar, Shahrizal
Published: (2019)