A CM-based prevention model for is projects implementation failure in Malaysian government hospitals
Malaysian government hospitals have adopted information system (IS) as an enabler in providing a better service to public. However, some of the IS implementations are facing many challenges such as users’ resistance to change, users did not realize the importance of the system, and lack of support a...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | eng eng |
Published: |
2017
|
Subjects: | |
Online Access: | https://etd.uum.edu.my/6557/1/s819671_01.pdf https://etd.uum.edu.my/6557/2/s819671_02.pdf |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my-uum-etd.6557 |
---|---|
record_format |
uketd_dc |
institution |
Universiti Utara Malaysia |
collection |
UUM ETD |
language |
eng eng |
advisor |
Che Pa, Noraziah |
topic |
T58.6-58.62 Management information systems |
spellingShingle |
T58.6-58.62 Management information systems Noorhayati, Md Jasin A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
description |
Malaysian government hospitals have adopted information system (IS) as an enabler in providing a better service to public. However, some of the IS implementations are facing many challenges such as users’ resistance to change, users did not realize the importance of the system, and lack of support and monitoring from the middle managers and top management. Consequently, it failed to be implemented successfully. Preliminary studies revealed that there is no guideline for IS implementation in government hospitals in Northern Region of Malaysia. Hence, the study investigates the failure factors of IS implementation in hospital and construct a prevention model which incorporates Change Management (CM). An extensive literature review and interviews have been conducted. Critical Failure Factors (CFFs) of IS projects implementation and three CM models (Lewin’s CM model, Kotter’s CM model and Prosci’s ADKAR model) have been identified. Key persons representing top management, IT practitioners and medical practitioners from four selected government hospitals in Northern Region of Malaysia were involved in data collection. A CM-based prevention model was constructed based on the identified CFFs and three CM models. Delphi technique was used to evaluate the proposed model, involving domain experts from the selected hospitals. Thirty-six CFFs have been discovered which have been categorized into four main categories; human issues, technology and infrastructure issues, software limitations, and support issues. The proposed prevention model is divided into three sub-phases of Implementation; Pre-Implementation, During-Implementation, and Post-Implementation. The model is believed to be beneficial for top management, IT practitioners and medical practitioners in preventing IS implementation failure among government hospitals in Northern Region of Malaysia. |
format |
Thesis |
qualification_name |
other |
qualification_level |
Master's degree |
author |
Noorhayati, Md Jasin |
author_facet |
Noorhayati, Md Jasin |
author_sort |
Noorhayati, Md Jasin |
title |
A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
title_short |
A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
title_full |
A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
title_fullStr |
A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
title_full_unstemmed |
A CM-based prevention model for is projects implementation failure in Malaysian government hospitals |
title_sort |
cm-based prevention model for is projects implementation failure in malaysian government hospitals |
granting_institution |
Universiti Utara Malaysia |
granting_department |
Awang Had Salleh Graduate School of Arts & Sciences |
publishDate |
2017 |
url |
https://etd.uum.edu.my/6557/1/s819671_01.pdf https://etd.uum.edu.my/6557/2/s819671_02.pdf |
_version_ |
1747828091143585792 |
spelling |
my-uum-etd.65572021-05-10T07:56:18Z A CM-based prevention model for is projects implementation failure in Malaysian government hospitals 2017 Noorhayati, Md Jasin Che Pa, Noraziah Awang Had Salleh Graduate School of Arts & Sciences Awang Had Salleh Graduate School of Arts and Sciences T58.6-58.62 Management information systems Malaysian government hospitals have adopted information system (IS) as an enabler in providing a better service to public. However, some of the IS implementations are facing many challenges such as users’ resistance to change, users did not realize the importance of the system, and lack of support and monitoring from the middle managers and top management. Consequently, it failed to be implemented successfully. Preliminary studies revealed that there is no guideline for IS implementation in government hospitals in Northern Region of Malaysia. Hence, the study investigates the failure factors of IS implementation in hospital and construct a prevention model which incorporates Change Management (CM). An extensive literature review and interviews have been conducted. Critical Failure Factors (CFFs) of IS projects implementation and three CM models (Lewin’s CM model, Kotter’s CM model and Prosci’s ADKAR model) have been identified. Key persons representing top management, IT practitioners and medical practitioners from four selected government hospitals in Northern Region of Malaysia were involved in data collection. A CM-based prevention model was constructed based on the identified CFFs and three CM models. Delphi technique was used to evaluate the proposed model, involving domain experts from the selected hospitals. Thirty-six CFFs have been discovered which have been categorized into four main categories; human issues, technology and infrastructure issues, software limitations, and support issues. The proposed prevention model is divided into three sub-phases of Implementation; Pre-Implementation, During-Implementation, and Post-Implementation. The model is believed to be beneficial for top management, IT practitioners and medical practitioners in preventing IS implementation failure among government hospitals in Northern Region of Malaysia. 2017 Thesis https://etd.uum.edu.my/6557/ https://etd.uum.edu.my/6557/1/s819671_01.pdf text eng public https://etd.uum.edu.my/6557/2/s819671_02.pdf text eng public other masters Universiti Utara Malaysia A Rahman, A. F., Abu Bakar, J. M., Ismail, A., Jamil, A. T., Mohd Saad, N., & Saadi, H. (2010). The implementation of Hospital Information System (HIS) in tertiary hospitals in Malaysia. Malaysian Journal of Public Health Medicine 2010, 10(2), 16–24. Abouzahra, M. (2011). Causes of failure in healthcare IT projects. In 3rd International Conference on Advanced Management Science (pp. 46–50). Retrieved from http://www.ipedr.com/vol19/9-ICAMS2011-A00018.pdf Ahmadi, H., Salahshour Rad, M., Nazari, M., Nilashi, M., & Ibrahim, O. (2014). Evaluating the factors affecting the implementation of hospital information system (HIS) using AHP method. Life Science Journal, 11(3), 202–207. http://doi.org/10.1017/CBO9781107415324.004 Akbar, F. (2013). What affects students’ acceptance and use of technology ? Carnegie Mellon University. Al-Ahmad, W., Al-Fagih, K., Khanfar, K., Alsamara, K., Abuleil, S., & Abu-Salem, H. (2009). A taxonomy of an IT project failure: Root causes. International Management Review, 5(1), 93–104. Retrieved from https://www.researchgate.net/profile/Khaled_Fagih/publication/282135018_A_Taxonomy_of_an_IT_Project_Failure_Root_Causes/links/5604647e08ae8e08c08a9319.pdf Alfaadel, F., Alawairdhi, M., & Al-zyoud, M. (2012). Success and failure of IT projects : A study in Saudi Arabia. Applied Computers and Computational Science, 77–82. http://doi.org/10.1.1.477.1068 Algharibi, A. J., & Arvanitis, T. N. (2011). Adapting the Unified Theory of Acceptance and Use of Technology ( UTAUT ) as a tool for validating user needs on the implementation of e-Trial software Systems. In Proceedings of the 25th BCS Conference on Human-Computer Interaction (pp. 526–530). Retrieved from http://ewic.bcs.org/upload/pdf/ewic_hci11_dc1.pdf Almajed, A. I., & Mayhew, P. (2014). An empirical investigation of IT project success in developing countries. In 2014 Science and Information Conference (pp. 984–990). London: IEEE. http://doi.org/10.1109/SAI.2014.6918305 Al-Shamlan, H. M., & Al-Mudimigh, A. S. (2011). The Chang Management strategies and processes for successful ERP implementation : A case study of MADAR. International Journal of Computer Science, 8(2), 399–407. Alter, S. (2013). Work System Theory : Overview of core concepts, extensions and challenges for the future. Journal of the Association for Information Systems, 14(2). Retrieved from http://repository.usfca.edu/at/35/ Anderson, J. E., & Schwager, P. H. (2003). SME adoption of wireless LAN technology : Applying the UTAUT model. In Proceedings of the 7th Annual Conference of the Southern Association for Information Systems (pp. 39–43). Bagchi, S., Kanungo, S., & Dasgupta, S. (2003). Modeling use of enterprise resource planning systems: A path analytic study. European Journal of Information Systems, 12(2), 142–158. http://doi.org/10.1057/palgrave.ejis.3000453 Barki, H., Pare, G., & Sicotte, C. (2008). Linking IT implementation and acceptance via the construct of psychological ownership of information technology. Journal of Information Technology, 23(4), 269–280. http://doi.org/10.1057/jit.2008.12 Basamh, S. S., Huq, M. N., & Ahmad Dahlan, A. R. (2013). Project implementation success and Change Management practices in Malaysian Government-linked companies (GLCs). Journal of Social and Development Sciences, 4(7), 349–355. Bindakheel, A., & Rosnah, N. (2010). Adoption of ICT at hospital: A case study of UMMC. ICECT 2010 - Proceedings of the 2010 2nd International Conference on Electronic Computer Technology, 157–160. http://doi.org/10.1109/ICECTECH.2010.5479968 Bloch, M., Blumberg, S., & Laartz, J. (2012). Delivering large-scale IT projects on time, on budget and on value. Retrieved from http://www.mckinsey.com/insights/business_technology/delivering_large-scale_it_projects_on_time_on_budget_and_on_value Bourda, F. M. (2013). Change Management theories and methodologies. Tata Consultancy Services. Retrieved from http://www.tcs.com/SiteCollectionDocuments/White Papers/EntSol-Whitepaper-Change-Management-Theories-Methodologies-0213-1.pdf Carpenter, M., Bauer, T., & Erdogan, B. (2012). Management principles. Ćirić, Z., & Raković, L. (2010). Change Management in information system development and implementation projects. Management Information System, 5(1), 23–28. Crawford, L., & Nahmias, A. H. (2010). Competencies for managing change. International Journal of Project Management, 28(4), 405–412. Croteau, A.-M., & Vieru, D. (2002). Telemedicine adoption by different groups of physicians. In Proceedings of the 35th Annual Hawaii International Conference on System Sciences (pp. 1985–1993). IEEE Comput. Soc. http://doi.org/10.1109/HICSS.2002.994121 Deng, H., & Gupta, P. (2005). Critical Success Factors for Information Systems Implementation : An End-User Perspective. In Managing Modern Organizations Through Information Technology in 2005 Information Resources Management Association International Conference (pp. 80–83). Faucheux, M. (2015). Examples of Change Management plans that worked. Retrieved March 13, 2016, from http://www.brighthubpm.com/change-management/55056-examples-of-change-management-plans-that-worked/ Garg, P. (2010). Critical Failure Factors for Enterprise Resource Planning Implementations in Indian Retail Organizations: An Exploratory Study. Journal of Information Technology Impact, 10(1), 35–44. Gerdsri, N., Assakul, P., & Vatananan, R. S. (2008). Applying change management approach to guide the implementation of technology roadmapping (TRM). In PICMET ’08 - 2008 Portland International Conference on Management of Engineering & Technology (pp. 2134–2140). IEEE. http://doi.org/10.1109/PICMET.2008.4599834 Ghanim, A., Munassar, F., & Ahmad Dahalan, A. R. (2013). Project and Change Management success factors from Malaysian government departments and agencies perspective, 11(2), 36–45. Hajeer, S. I. (2012). Critical Risk Factors for Information System ( IS ) Projects ( IS ) Projects between Sink and Swim. IJCSET, 2(6), 1270–1279. Handayani, D., Abdullah, R. B., Abdulgani, M. A., & Ahmad Dahlan, A. R. (2010). Critical success factors for IS project implementation in Malaysian Institutions of Higher Learning. Proceeding of the 3rd International Conference on Information and Communication Technology for the Moslem World (ICT4M) 2010, E40–E47. http://doi.org/10.1109/ICT4M.2010.5971912 Hastie, S., & Wojewoda, S. (2015). Standish Group 2015 Chaos Report - Q&A with Jennifer Lynch. Retrieved from http://www.infoq.com/articles/standish-chaos-2015 Heeks, R. (2002). Failure, success and Improvisation of Information Systems Projects in Developing Countries. Hoffer, J. (2007). Managing the Information Systems Project. In Modern Systems Analysis and Design (5th ed.). Prentice Hall. Retrieved from http://www.prenhall.com/behindthebook/0132240769/pdf/Hoffer_CH03.pdf Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity. International Journal of Project Management, 33(2), 291–298. http://doi.org/10.1016/j.ijproman.2014.08.005 Huang, L. K. (2015). Exploring factors affecting top management support of it implementation: A stakeholder perspective in hospital. Journal of Information Technology Management, XXVI, 31–45. Retrieved from http://jitm.ubalt.edu/XXVI-1/article3.pdf Ismail, N. I., Abdullah, N. H., Shamsudin, A., & Ariffin, N. A. N. (2013). Implementation Differences of Hospital Information System (HIS) in Malaysian Public Hospitals. International Journal of Social Science and Humanity, 172(2), 115–120. http://doi.org/10.7763/IJSSH.2013.V3.208 Jern, A. (2009). Faculty of Electronics , Communication , and Automation Anna Jern. Helsinki University of Technology. Keeney, S., Hasson, F., & Mckenna, H. P. (2001). A critical review of the Delphi technique as a research methodology for nursing, 38, 195–200. Kornkaew, A. (2012). Management information system implementation challenges, success key issues, effects and consequences: A case study of Fenix System. Levasseur, R. E. (2010). People skills: Ensuring project success - a change management perspective. Interfaces, 40(2), 159–162. http://doi.org/10.1287/inte.1090.0473 Leyland, M., Hunter, D., & Dietrich, J. (2009). Integrating Change Management into Clinical Health Information Technology Project Practice. In 2009 World Congress on Privacy, Security, Trust and the Management of e-Business (pp. 89–99). IEEE. http://doi.org/10.1109/CONGRESS.2009.28 Lowry, P. B., Cao, J., & Everard, A. (2011). Privacy concerns versus desire for interpersonal awareness in driving the use of self-disclosure technologies: The case of Instant Messaging in two cultures. Journal of Management Information Systems, 27(4), 163–200. http://doi.org/10.2753/MIS0742-1222270406 Lunenburg, F. C. (2010). Managing change : The role of the change agent. International Journal of Management, Business, and Administration, 13(1), 1–6. Maarop, N. (2011). Exploring factors that affect teleconsultation adoption : In the case of Malaysia. PACIS 2011: 15th Pacific Asia Conference on Informatioin Systems: Quality Research in Pacific, 1–12. Marchal, B., Belle, S. Van, Brouwere, V. De, Witter, S., & Kegels, G. (2014). Complexity in Health: Consequences for research & evaluation. Retrieved from https://www.abdn.ac.uk/femhealth/documents/Deliverables/Complexity_Working_paper.pdf Md. Deros, B., Ab. Rahman, M. N., A. Ghani, J., Abd. Wahab, D., Hashim, M. H., & Khamis, N. K. (2008). Role of senior management in TQM implementation in Malaysian small and medium enterprises. The Institution of Engineers, Malaysia, 72(3), 15–20. Mohd, H., & Syed Mohamad, S. M. (2005). Acceptance model of Electronic Medical Record. Journal of Advancing Information and Management Studies, 2(1)(June 2005), 75–92. Retrieved from http://repo.uum.edu.my/2246/ Munassar, F., Ghanim, A., & Ahmad Dahlan, A. R. (2013). Change Management and its contribution to the success of IT project implementation. International Journal of Information and Communication Technology Research, 3(4), 134–140. Munns, A. K., & Bjeirmi, B. F. (1996). The role of project management in achieving project success. International Journal of Project Management, 14(2), 81–87. http://doi.org/http://dx.doi.org/10.1016/0263-7863(95)00057-7 Namakula, S., & Kituyi, G. M. (2014). Examining Health Information Systems Success Factors in Uganda ’ s Healthcare System Examining Health Information Systems Success Factors in Uganda ’ s Healthcare System, 4(1), 1–16. Neumeier, M. (2013). Using Kotter ’ s Change Management Theory and Innovation Diffusion Theory In Implementing an Electronic Medical Record. Canadian Journal of Nursing Informatics, 8((1&2)), 1–8. Retrieved from cjni.net http://cjni.net/journal/?p=2880 Patanakul, P. (2014). Managing large-scale IS/IT projects in the public sector: Problems and causes leading to poor performance. The Journal of High Technology Management Research, 25(1), 21–35. http://doi.org/10.1016/j.hitech.2013.12.004 Pearlson, K. E., & Saunders, C. S. (2009). Strategic management of information systems (Fourth). John Wiley & Sons. Price, J. M. C. (2012). Coding : Open Coding. In A. J. Mills, G. Durepos, & E. Wiebe (Eds.), Encyclopedia of Case Study Research (pp. 156–157). Thousand Oaks: SAGE Publications, Inc. http://doi.org/http://dx.doi.org/10.4135/9781412957397 Qassim, A. A. (2008). Why information systems projects fail : Guidelines for Successful Projects. The INTOSAI IT Journal, 12–17. Retrieved from http://www.intosaiitaudit.org/intoit_articles/26_p12top17.pdf Sabyasachi. (2013). What is a project management plan. Retrieved from http://www.simplilearn.com/what-is-a-project-management-plan-article Sood, S. P., Nwabueze, S. N., Mbarika, V. W. A., Prakash, N., Chatterjee, S., Ray, P., & Mishra, S. (2008). Electronic Medical Records : A review comparing the challenges in developed and developing countries. In Proceedings of the 41st Hawaii International Conference on System Sciences (pp. 1–10). Sutan Ahmad Nawi, H., Abd. Rahman, A., & Ibrahim, O. (2012). Government ICT project failure factors: Project stakeholders’ views. Journal of Information Systems Research and Innovation, 69–77. http://doi.org/10.1109/ICRIIS.2011.6125738 Thangaratinam, S., & Redman, C. W. (2005). The Delphi technique. The Obstetrician & Gynaecologist, 7(2), 120–125. http://doi.org/10.1576/toag.7.2.120.27071 Turner, J. R., & Müller, R. (2005). The project manager’s leadership style as a success factor on projects: A literature review. Project Management Journal, 36, 49–61. Turner III, D. W. (2010). Qualitative Interview Design: A Practical Guide for Novice Investigators. The Qualitative Report (Vol. 15). Retrieved from http://www.nova.edu/ssss/QR/QR15-3/qid.pdf Varghese, S. (2014). The Implementation of an Electronic Medication Management S ystem in a Nursing Home. Royal College of Surgeons in Ireland. Retrieved from http://epubs.rcsi.ie/cgi/viewcontent.cgi?article=1039&context=mscttheses Venkatesh, V., Morris, M. G. ., Davis, G. B. ., & Davis, F. D. . (2003). User Acceptance of Information Technology: Toward a unified view. MIS Quarterly, 27(3), 425–478. Retrieved from https://www.jstor.org/stable/pdf/30036540.pdf Wong, A., Chau, P. Y. K., Scarbrough, H., & Davison, R. (2005). Critical Failure Factors in ERP Implementation. PACIS 2005 Proceedings, 1–15. Retrieved from http://wrap.warwick.ac.uk/28006/ Yusof, M. M., Papazafeiropoulou, A., Paul, R. J., & Stergioulas, L. K. (2008). Investigating evaluation frameworks for health information systems. International Journal of Medical Informatics, 77(6), 377–385. http://doi.org/10.1016/j.ijmedinf.2007.08.004 Ziemba, E., & Oblak, I. (2015). Change Management in information systems projects for public organizations in Poland. Interdisciplinary Journal of Information, Knowledge, and Management, 10(May), 47–62. Retrieved from http://www.ijikm.org/Volume10/IJIKMv10p047-062Ziemba1527.pdf Zimmerman, B. J., Dubois, N., Houle, J., Lloyd, S., Mercier, C., Brousselle, A., & Rey, L. (2012). How does complexity impact evaluation? An introduction to the special issue. Canadian Journal of Program Evaluation, 26(3). |