Achieving sustainable campus through integrated project delivery in northern region higher education institution

The sustainability commitment of a nation can be reflected in how much attention is given to the sustainability development of youth and future leaders. Higher Education Institutions (HEIs) are one of the main players in producing the nation's future leaders by emulating the sustainability agen...

Full description

Saved in:
Bibliographic Details
Main Author: Syukran, Abdul Rahim
Format: Thesis
Language:eng
eng
Published: 2017
Subjects:
Online Access:https://etd.uum.edu.my/6754/1/s815120_01.pdf
https://etd.uum.edu.my/6754/2/s815120_02.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uum-etd.6754
record_format uketd_dc
institution Universiti Utara Malaysia
collection UUM ETD
language eng
eng
advisor Mohd Nawi, Mohd Nasrun
Radzuan, Kamaruddin
topic LB2801-3095 School administration and organization
spellingShingle LB2801-3095 School administration and organization
Syukran, Abdul Rahim
Achieving sustainable campus through integrated project delivery in northern region higher education institution
description The sustainability commitment of a nation can be reflected in how much attention is given to the sustainability development of youth and future leaders. Higher Education Institutions (HEIs) are one of the main players in producing the nation's future leaders by emulating the sustainability agenda into the curriculum and physical infrastructures. Therefore, it is crucial that sustainable campuses are designed to fulfil the educational needs of these future leaders. However, due to the nature of construction development, campuses are being developed in the traditional methods which are burdened by many challenges such as project delay, fragmented processes and high construction waste. To overcome these challenges, many scholars have proposed the Integrated Project Delivery (IPD) as a method that is beneficial for sustainable development. Accordingly, this research investigated a novel approach to sustainable campus development by identifying how IPD can be applied in the physical development of campuses specifically within the Malaysian northern region HEIs. Semi-structured interviews were conducted with 6 participants who were the experts or main decision- makers in the respective HEIs. The qualitative data was analysed using the Template Analysis method with the aid of Nvivo 10 software. The findings indicate that although the participants were aware of the importance of sustainability development, most of them were unfamiliar with most of the IPD practices in campus development. Nevertheless, some of the IPD practices were applied by the participants. The guideline developed at the end of this research highlights the current practices which overlap the IPD principles and suggests the additional aspects of IPD that can be merged with sustainable campus development activities. Some limitations of the study are also indicated, suggesting opportunities for future research.
format Thesis
qualification_name masters
qualification_level Master's degree
author Syukran, Abdul Rahim
author_facet Syukran, Abdul Rahim
author_sort Syukran, Abdul Rahim
title Achieving sustainable campus through integrated project delivery in northern region higher education institution
title_short Achieving sustainable campus through integrated project delivery in northern region higher education institution
title_full Achieving sustainable campus through integrated project delivery in northern region higher education institution
title_fullStr Achieving sustainable campus through integrated project delivery in northern region higher education institution
title_full_unstemmed Achieving sustainable campus through integrated project delivery in northern region higher education institution
title_sort achieving sustainable campus through integrated project delivery in northern region higher education institution
granting_institution Universiti Utara Malaysia
granting_department School of Technology Management & Logistics
publishDate 2017
url https://etd.uum.edu.my/6754/1/s815120_01.pdf
https://etd.uum.edu.my/6754/2/s815120_02.pdf
_version_ 1747828112203186176
spelling my-uum-etd.67542021-08-18T07:58:39Z Achieving sustainable campus through integrated project delivery in northern region higher education institution 2017 Syukran, Abdul Rahim Mohd Nawi, Mohd Nasrun Radzuan, Kamaruddin School of Technology Management & Logistics School of Technology Management & Logistics LB2801-3095 School administration and organization The sustainability commitment of a nation can be reflected in how much attention is given to the sustainability development of youth and future leaders. Higher Education Institutions (HEIs) are one of the main players in producing the nation's future leaders by emulating the sustainability agenda into the curriculum and physical infrastructures. Therefore, it is crucial that sustainable campuses are designed to fulfil the educational needs of these future leaders. However, due to the nature of construction development, campuses are being developed in the traditional methods which are burdened by many challenges such as project delay, fragmented processes and high construction waste. To overcome these challenges, many scholars have proposed the Integrated Project Delivery (IPD) as a method that is beneficial for sustainable development. Accordingly, this research investigated a novel approach to sustainable campus development by identifying how IPD can be applied in the physical development of campuses specifically within the Malaysian northern region HEIs. Semi-structured interviews were conducted with 6 participants who were the experts or main decision- makers in the respective HEIs. The qualitative data was analysed using the Template Analysis method with the aid of Nvivo 10 software. The findings indicate that although the participants were aware of the importance of sustainability development, most of them were unfamiliar with most of the IPD practices in campus development. Nevertheless, some of the IPD practices were applied by the participants. The guideline developed at the end of this research highlights the current practices which overlap the IPD principles and suggests the additional aspects of IPD that can be merged with sustainable campus development activities. Some limitations of the study are also indicated, suggesting opportunities for future research. 2017 Thesis https://etd.uum.edu.my/6754/ https://etd.uum.edu.my/6754/1/s815120_01.pdf text eng public https://etd.uum.edu.my/6754/2/s815120_02.pdf text eng public masters masters Universiti Utara Malaysia Abdelhamid, T. S. (2007). Lean Construction Principles and Method, Lean Construction Overview. Graduate Class Offering at Michigan State University. Retrieved from: http://www.slideshare.net/tabdelhamid/lean- construction-introduction Adam, W. M. (2006). The Future of Sustainability: Re-thinking Environment and Development in the Twenty-First Century. Adomssent, M., Godemann, J. & Michelsen, G. (2007). Transferability of approaches to sustainable development at universities as a challenge, International Journal of Sustainability in Higher Education, Vol. 8 No. 4, pp. 385-402. Agyekum-Mensah G., Knight A. & Coffey C. (2012). 4Es and 4 Poles Model of Sustainability: Redefining Sustainability in the Built Environment. Struc Surv 30: 426-442. AJA Minnesota, (2012). IPD Case Study. School of Architecture -University of Minnesota AIA California Council, & AIA National (2009). Experiences in Collaboration: On the Path to IPD. Sacramento. AM California Council, & McGraw Hill Construction (2007). A Working Definition: Integrated Project Delivery Sacremento. AIA National, & AIA California Council (2007). Integrated Project Delivery: A Guide The American Institute of Architects. Akintoye, A,, McIntosh, G. & Fitzgerald, E. (2000). A Survey of Supply Chain Collaboration and Management in The UK Construction Industry. European Journal of Purchasing & Supply Management, 6: 159-168. Al-Rawi, K. (2008). The Cohesiveness Within Teamwork: The Relationship to Performance Effectiveness - Case Study. Education, Business and Society: Contemporary Middle Eastern Issues 1(2), 92-106. Alshawi, M. & Faraj, I. (2002). Integrated Construction Environments: Technology and Implementation. Construction Innovation, Vol. 2 No. 1, pp. 33-51. Alshuwaikhat, H. M. & Abubakar, I. (2008). An Integrated Approach to Achieving Campus Sustainability: Assessment of The Current Campus Environmental Management Practices. Journal of Cleaner Production 16 (2008) 1777-1785 Anderson, R. (2010). An Introduction to the IPD Workflow for Vectonvorks BLM Users, Nemetschek, Vectonvorks. North America. Ankrah, N. A., Proverbs, D. & Debrah, Y. (2009). Factors Influencing the Culture of A Construction Project Organisation: An Empirical Investigation. Engineering, Construction and Architectural Management 16(1), 26-47. Anumba, C. J., Baugh, C. & Khalfan, M. M. A. (2002). Organisation Structure to Support Concurrent Engineering to Construction, Industrial Management and Data Systems. Anumba, C. J. & Evbuomwan, N. F. 0. (1997). Concurrent Engineering in Design Build Projects- Construction Management and Economics. Anumba, C. J., Kamara, J. M. & Evbuomwan, N. F. 0. (1997). Construction in the UK Petrochemical Industry- Aspects of Concurrent Engineering Practice in Adams T. M. (Editor). Proceedings of Fourth Congress Computing in Civil Engineering, June 16-18, Philadelphia, Pennsylvania. Associated General Contractors of America (2008). The Contractor's Guide to BIM-2nd Edition. Babbie, E., & Rubin, A. (2008). Research Methods for Social Work. Baiden, B. K., Price, A. D. F. & Dainty, A. R. J. (201 1). The Effect of Integration on Project Delivery Team Effectiveness. International Journal of Project Management. Banwell, H. (1964) The Placing and Management of Contracts For Buildings and Civil Engineering Work, A Report of the Committee of Sir Harold Banwell, London: HMSO. Baiden, B.K., Price, A.D.F. & Dainty, A.R.J. (2006). The Extent of Team Integration Within Construction Projects. International Journal of Project Management. Baker, D. P., Day, R., & Salas, E. (2006). Team Work as an Essential Component of High-Realibility Organizations, Helth Service Research, Aug 2006, 141(4pt2) 1576-1598. Baker, K. (2004). Review of Housing Supply: Delivering Stability: Securing our Future Housing Needs HMSO, London Barlett, P. F., & Chase, G. W. (2004). Sustainability on Campus: Stories and Strategies for Change. MIT Press. Becerik-Gerber, B., DDes & Kent, D. (2010). Implementation of Integrated Project Delivery and Building Information Modelling on a Small Commercial Project. Bekoff, M., & Bexell, S. (2010). Ignoring Nature: Why We Do It, The Dire Consequences, and The Need For A Paradigm Shift to Save Animals, Habitats, And Ourselves. Black, C., Akintoye, A. & Fitzgerald, E. (2000). An Analysis of Success Factors and Benefits of Partnering in Construction. International Journal of Project Management, 18:423-434. Build-Operate-Transfer (BOT). (2008). Retrieved from http://www.unescap.org/ttdw/pppprimer/2253_ b_buildoperatetransferbot.html Bourn, J. (2001). Modernising Construction (HC87 Session 2000-2001). London: National Audit Office. Bowron, J. (2002). Re-Engineering the Project Procurement Process Through Concurrent Engineering, (PhD Thesis, Loughborough University, UK). Broughton, T. (1990). Simultaneous Engineering in Aero Gas Turbine Design & Manufacture, Proceedings of the International Conference on CE. 4-5 December 1990, London, pp. 25-36. Brown, 2. M., Cole, R. J., Robinson, J., & Dowlatabadi, H. (2010). Evaluating User Experience in Green Buildings in Relation to Workplace Culture and Context. Facilities, Vol. 28 Nos 314, pp. 225-38. Brooks, J., McCluskey, S., Turley, E., & King, N. (2015). The Utility of Template Analysis in Qualitative Psychology Research. Qualitative Research in Psychology, 12(2), 202-222. Bryman, A. & Bell, E. (2007). Business Research Methods. (2nd ed.) Oxford University Press Inc., New York. Bullen, P. A. & Love, P. E. D. (2011), Adaptive Reuse of Heritage Buildings, Structural Survey, Vol. 29 No. 5, pp. 411-21. Buzell, R. D. & Ortmeyer, G. (1995). Channel Partnership Streamline Distributions. Sloan Management Review, 36 (85). Cassils, J. A. (2004). Overpopulation, Sustainable Development, and Security: Developing an Integrated Strategy. Population and Environment 25(3), 171-194. Cassidy, R. (2003). White Paper on Sustainability. Building Design and Construction, 10. Chan, A. P. C., Chan, D. W. M. & Ho, K. S. K. (2003). An Empirical Study of The Benefits of Construction Partnering in Hong Kong, Journal of Construction Management and Economics, 21: 523-533. Chan, E. H., & Ann, T. W. (2005). Contract Strategy for Design Management in the Design and Build System.International Journal of Project Management, 23(8), 630-639. CheMat, M. M. (2006) .Towards Maintenance Cost Optimisation through Value Management. Proceeding of National Seminar of Developing a Maintenance Culture, Petaling Jaya, Selangor. Chen, W., & Chen, T. (2007). Critical Success Factors for Construction Partnering in Taiwan. International Journal of Project Management, 25, 475-485. doi:l0.10l6/j.ijproman.2006.12.003 Chen, S. J., Lin, L. (2002). A Project Task Coordination Model for Team Organisation In Concurrent Engineering. Concurrent Engineering: Research and Applications 10 (3), 187-202. Cho, S. & Ballard, G. (2011). Last Planner and Integrated Project Delivery. Lean Construction Journal. Lean and Integrated Project Delivery special issue. 67-78 Cheung, S., IVg, T. S. T., Wong, S. & Suen, H. C. H. (2003). Behavioral Aspect in Construction Partnering. International Journal of Project Management. CIDB (2009). Industrialised Building System (IBS): Implementation Strategy from R&D Perspective, July, Kuala Lumpur. Cohen, J. (2010). Integrated project delivery: Case studies. Sacramento, CA, The American Institute of Architects California Council. Cohen, J. (2010). Integrated Project Delivery: Case Studies. (Report for AIA/AIACalifornia Council). Retrieved from the American Institute of Architects website: http://www.aia.org/about/initiatives/AIABO82049 Cole, L., & Wright, T. (2003). Assessing Sustainability on Canadian University Campuses: Development of a Campus Sustainability Assessment framework. Unpublished Master's Thesis, Royal Roads University, Victoria, BC. Concessions, (2013),Build-Operate-Transfer (BOT) and Design-Build-Operate (DBO) Projects. (n.d.). Retrieved from http://ppp.worldbank.org/public- privatepartnership/agreements/concessions-bots- dbos Construction Industry Development Board Malaysia - CIDB (2001). Construction Industry Review 199912000. Council, A. C. (2007). Integrated Project Delivery - A Working Definition.Ca1ifornia: The American Institute of Architects, California Council. Conti, B. & Kleiner, B. H. (1997). How to Increase Teamwork in Organizations, Training for Quality. Vol. 5 Iss 1 pp. 26 - 29. Cortese, A. (2003). The Critical Role of Higher Education in Creating a Sustainable Future. Planning for Higher Education 3l(3): 15-22. Cox, A., & Townsend, M. (1997). Latham as Half-Way House: A Relational Competence Approach to Better Practice in Construction Procurement. Engineering, Construction and Architectural Management, 4(2), 143-158. Crane, A. (2002). Rethinking Construction is Proving the Business Case for Change. Creswell, J. W. (2009). Editorial: Mapping the Field of Mixed Methods Research. Cross, J. (2008). Hat Trick: BIM, Sustainability and Design-Build Converge and Thrive within Structural Steel Industry. Design-Build Dateline, 15(4), pages 22-27. Crotty, M. (2004). The Foundations of Social Research: Meaning and Perspective in the Research Process. London Sage. Dainty, A. R. J., Briscoe, G. H. & Millett, S. J. (2001). Subcontractor Perspectives on Supply Chain Alliances. Construction Management and Economics, 19(8): 841-848. Darus, Z. M., Rashid, A. K. A., Hashim, N. A., Omar, Z., Saruwono, M. & Mohammad, N. (2009). Development of Sustainable Campus: Universiti Kebangsaan Malaysia Planning and Strategy. WSEAS Transactions on Environment and Development Issue 3, Volume 5, March 2009. 273-282 Dickinson, T. L. & McIntyre, R. M. (1997). A Conceptual Framework for Teamwork Measurement, In Brannick, M. T., Salas, E. & Prince, C. (eds.) Team Performance Assessment and Measurement: Theory, Methods and Applications, New Jersey: Lawrence Earlbaum Associates Inc. Du Plessis, C. (2004) A Strategic Framework for Sustainable Construction in Developing Countries. Construction Management and Economics (January 2007) 25, 67-76 Dulaimi, M. F., Ling, F. Y. Y., Ofori, G. & Silva, N. D. (2002). Enhancing Integration and Innovation in Construction, Building Research & Information, http://www.tandf.co.uk/journals. Edwards, B. W., & Naboni, E. (2013). Green Buildings Pay: Design, Productivity and Ecology. Routledge. Edwards, R. (2007). Early Contractor Involvement (ECI) Contracts in the South Australian Transport Infrastructure Construction Industry, DTEI, South Australia. Egan, J. (2002). Accelerating Change, Strategic Forum for Construction, London. Egan, J. (1998). Rethinking Construction, Report of The Construction Task Force on The Scope for Improving The Quality and Efficiency of UK Construction Industry, Department of the Environment, Transport and the Regions, London. Egbu, C. & Robinson, H. (2005). Construction as Knowledge Based Industry, In: Rodwell, D., Knowledge Management in Construction, Blackwell Publishing, UK. El-Asmar, M., Hanna, A. S., & Loh, W. Y. (2013). Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. Journal of Construction Engineering and Management, 139(11). El-Asmar, M. (2012). Modeling and Benchmarking Performance for The Integrated Project Delivery (IPD) System. (Thesis PhD. University Of Wisconsin - Madison, 20 12) El-adaway, I. H. (2010). Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 248-254. doi: 10.1061/(ASCE)LA.1943-4170.0000024 Erkessousi, E. N., (2010). Integrated Project Delivery Dissertation Copenhagen School of Design & Technology. Evbuomwan, N. F. 0 . & Anumba, C. J. (1998). An Integrated Framework for Concurrent Life-Cycle Design and Construction, Advances in Engineering Software, Vol. 29 (7-9). Farias, F., (2013). Contemporary Strategies For Sustainable Design. Unpublish PhD thesis for Texas A&M University. Finlay, J. (2010) Creating Campus Culture: A Critical Analysis of Residence Sustainability Initiatives at Queen's University. (Thesis B. A. Queen's University) Fisk, E. R., & Reynolds, W. D. (2011). Construction Project Administration. Pearson Higher Ed. Flanagan, R. & Norman, G. (1993). Risk Management and Construction. Oxford: Blackwell Publishing. Syphers, G., Baum, M., Bouton, D., & Sullens, W. (2003). Managing the cost of green buildings. KEMA (dir.). Ghassemi, R. & Becerik-Gerber, B. (2011). Transitioning to Integrated Project Delivery: Potential Barriers and Lessons Learned. Lean Construction Journal, 2011, 32-52. Retrieved from http://www.leanconstructionjournal.org. Gillham, B. (2000). Case Study Research Methods, London: Continuum. Glick, S. & Guggemos, A. (2009). IPD and BIM: Benefits and Opportunities for Regulatory Agencies. Proceedings of the 4jrh Associated Schools of Construction (ASC?) Annual Conference, Gainesville, FL, I-4 April. Pacific Northwest National Laboratory (PNNL). Gotthelf, H. N. (2011). The Potential of Integrated Project Delivery in Greening The Structural Steel Delivery Process. (MSc Thesis) Colorado State University Fort Collins. Grix, J. (2010). The Foundations of Research, 2nd Ed. Palgrave Macmillan, London. Hamid, A. R. A., Singh, B., Yusof, A. M. & Abdullah, N. A. M. (2011). The Employment of Foreign Workers at Construction Sites. 2nd International Conference on Construction and Project Management (IPEDR), Vo1. 15 (2011) (2011) IACSIT Press, Singapore Hamid & Sarshar, Bank Negara Malaysia (2003). Annual Report 2002, Kuala Lumpur, Bank Negara Hamid, Z. Kamar, K. A. M. Zain, M. Ghani, K. & Rahim, A. H. A. (2008) Industrialized Building System (IBS) in Malaysia: the Current State and R&D Initiatives, Malaysia Construction Research Journal, Vol. 2 (1): 1-13. Harbans Sigh K.S. (2005). Understanding Engineering, Construction Contracts Construction Contracts: An Overview. The Ingenieur, pg.24. KDN PP11720/1/2008 ISSN 0128-4347 VOL.35 SEPT - NOV 2007. Hasan, M. N. H. Indicators Of Sustainable Development: The Malaysian Perspective Institute for Environment and Development (LESTARI) Universiti Kebangsaan Malaysia. Hayes, N. (2002). Managing Teams: A Strategy for Success. Cengage Learning EMEA. Retrieved from: https://books.google.com.my/books?hl=en&lr=&id= 2fi2dbSq JlsC&oi=fnd&pg=PR9&dq=hayes+2002+ concept+of+teamwork&ots=23ebD09k3d&si~Lrk Hayes, S. C., Luoma, J. B., Bond, F. W., Masuda, Akihiko & Lillis, J. (2006) Acceptance and Commitment Therapy: Model, Processes and Outcomes. Psychology Faculty Publications. Paper 101. Retrieved from: http://.scholarworks.gsu.edu/psych_facpub/101 Heenvagen, J. (2000). Green Buildings, Organizational Success And Occupant Productivity. Building Research & Information. 28(5/6): pp 353-367. Heinberg, R. (2010). What Is Sustainability? The Post Carbon Reader Series: Foundation Concepts. Hillebrandt, P. M. (2000). Economic Theory and the Construction Industry. (3rd ed.). Macmillan, London. Huovila, P., Koskela, L., Lautanala, M. (1997). Fast or Concurrent: the Art of Getting Construction 1mproved.In: Lean Construction (ed. L. Alarcon), A. A. Balkema, and Rotterdam. Hussain, T. P. R. S., Ismail, H. & Noh, M. K. M. (2013). Kesedaran Mengenai Penjimatan Tenaga Elektrik dan Kelestarian Alam Sekitar [Awareness Of Energy-Saving Electrical and Environmental Sustainability]. Persidangan Kebangsaan Ekonomi Malaysia ke VIII (PERKEM VIII) "Dasar Awam Dalam Era Transformasi Ekonomi: Cabaran dun Halatuju" Johor Bahru, 7 - 9 Jun 2013. ISSN: 2231-962X. pp977 - 990 Hyde, K. (2000). Recognizing Deductive Processes in Qualitative Research Qualitative Market Research, International Journal, Vol. 3(2): 82-90. Integrated Project Delivery (IPD): A Guide (2007) California Council, National, The American Institute of Architects, version 1. Ismail, R., Muzni, S. S. M., Ibrahim, F. A., Rashid, Z. 2. A., & Baharum, F. (2015). The Implementation of Environmental Management in Construction Project: A Review. Advances In Environmental Biology, 74-77. Available at: Academic OneFile. Web. 19 Aug. 2016. Ibrahim, I. K., Costello, S. B., & Wilkinson, S. (2013). Key Practice Indicators of Team Integration in Construction Projects: A Review. Team Performance Management: An International Journal, 19(3/4), 132-152. James, M., & Card, K. (2012). Factors Contributing to Institutions Achieving Environmental Sustainability. International Journal of Sustainability in Higher Education, 13(2), 166-176. Jayasena, H. S. & Senevirathna, N. S. (2012). Adaptability of Integrated Project Delivery in A Construction Industry. CIOB Construction Conference 2012 - Global Challenges in Construction Industry, Colombo Ceylon Institute of Builders - Sri Lanka. Pp 188-195. Jernigan, F. E. (2007). Big BIM, Little Bim: The Practical Approach To Building Information Modeling: Integrated Practice Done The Right Way! 1st ed. Salisbury, MD: 4Site Press. John G. L. (1993). Construction Productivity - An Input-Output Approach. Doctor of Philosophy, Department of Building Engineering and Surveying, Heriot-Watt University, Edinburgh. Jones, B. (2014). Integrated Project Delivery (IPD) For Maximizing Design And Construction Considerations Regarding Sustainability. Procedia Engineering, 95, 528-538. Kagioglou, M., Cooper, R., Aouad, G. & Sexton, M. (2000). Rethinking Construction: the Generic Design and Construction Process Protocol. Engineering, Construction and Architectural Management, 7(2), pp 141-153. Kagioglou, M., Cooper, R., Aouad, G., Hinks, J., Sexton, M. & Sheath, D. (1998). Final Report: Generic Design and Construction Process Protocol. The University of Salford. Kajewski, S., Chen, S. E., Brewer, G., Gameson, R., Gajendran, T., Kolomy, R., Lenard, D., MacKee, J., Martins, R., Sher, W., McCabe, K. & McCann, J. (2003), Project Team Integration: Communication, Coordination and Decision Support. Part a: Scoping Studies. Technical Report 2001-008-C-04, CRC-CI, Queensland University of Technology, available at: http://eprints.qut.edu.au/l7874/1/17874.pdf Kamar, K. A. M. Alshawi, M. & Hamid, Z. A. (2009). Barriers to Industrialised Building System (IBS): The Case of Malaysia, In BuHu 9th International Postgraduate Research Conference (IPGRC) (Eds. Alshawi, M., Ahmed, V., Egbu, C. &Sutrisna, M.), Salford, United Kingdom. Karnara, J. M., Anumba, C. J. & Evbuomwan N. F.O. (2001). Assessing the Suitability of Current Briefing Practice in Construction Within a Concurrent Engineering framework. International Journal of Project Management 19: 337-351. Kates, R. W., Parris, T. M. & Leiserowitz, A. A. (2005) What is Sustainable Development? Goals, Indicators, Values and Practise. Environment: Science and Policy for Sustainable Development, Volume 47, Number 3, pages 8-21. Katzenbach, J. R. & Smith, D. K., (1993). The Wisdom of Teams: Creating the High-Performance Organization. Harvard Business School Press. Boston. Keller, F. G., (2015). Introduction to Evaluating the Impact of Rural Universities on Local Communities. Compilation of Eastern Oregon University's College of Business MBA program. Evaluating The Impact Of Rural Universities On Local Communities. https://www.eou.edu/rural/ files/2015/03/Evaluating-the-Impact-of-Rural- Universities-on-Local-Communities.pdf Kent, D. C., & Becerik-Gerber, B. (2010). Understanding Construction Industry Experience and Attitudes Toward Integrated Project Delivery. Journal of Construction Engineering and Management, 136(8), 815-825. Khoshnava, S. M., Ahankoob, A., Preece, C., & Rostami, R. (2008). Potential Application of BIM in Construction Dispute and Conflict. Management in Construction Research Association (MiCRA) Postgraduate Conference (Vol. 178-184). Khalfan, M. M. A. & McDermott, P. (2009). Integration of Suppliers and Manufacturers through Innovative Procurement. Proceeding in 2nd Construction Industry Research Achievement International Conference (CIRIAC 2009), CIDB, Kuala Lumpur, Malaysia. Khemlani, L. (2009) Sutter Medical Center Castro Valley: Case Study of an IPD Project AECBytes, http://www.aecbytes.com/buildingthefuture/2OO9/ Sutter_IPDCaseStudy.html [accessed Nov 18,2014). Kieran, S., & Timberlake, J. (2003). Refabricating Architecture: How Manufacturing Methodologies Are Poised To Transform Building Construction. McGraw Hill Professional. Access from; https://gsappworkflow2011.files.wordpress. com/2011/09/kieranrefabricating-architecture.pdf Kim, J. J. & Rigdon, B. (1998). Sustainable Architecture Module: Introduction to Sustainable Design. Kim, Y. & Dossick, C. (2011). What Makes the Delivery of a Project Integrated? A Case Study of Children's Hospital, Bellevue, WA. Lean Construction Journal, Lean and Integrated Project Delivery Special Issue, 53-66. King, N. (2004). Using Template Analysis in the Qualitative Analysis of Text. 2004) Essential Guide to Qualitative Methods in Organisational Research. Sage: London. King, N. (2012). Doing Template Analysis. Qualitative Organizational Research: Core Methods and Current Challenges, 426. Kong, A. T. & Gray, J. (2006). Problems With Traditional Procurement in the Malaysian Construction Industry - a Survey. In Runeson, Goran & Best, Rick, Eds. Proceedings Australasian Universities Building Educators Association Annual Conference, pages pp. 1-21, University of Technology, Sydney. Kraatz, J. A., Sanchez, A. X., & Hampson, K. D. (2014). Digital Modeling, Integrated Project Delivery and Industry Transformation: An Australian Case Study. Buildings, 4(3), 453-466. Kulatunga, U. (2008). Influence of Performance Management Towards Construction Research and Development. Unpublished PhD Thesis, University of Salford, UK. Lancaster, F. D. & Tobin, J. (2010). Integrated Project Delivery: Next Generation BIM for Structural Engineering. 2010 Structural Congress, ASCE. Retrieved from ftp://ftp.eng.auburn.edu/pub/hza0002/ASCE%2020 10/data/papers/3OO.pdf. Landman, T. (2000). Issues and Methods in Comparative Politics: An Introduction, London, Routledge. Lanting, R. (1998). Sustainable Construction in the Netherlands, Report 9 in CIB Sustainable Development and the Future of Construction.A Comparison of Visions from Various Countries, CIB Report Publication 225, CIB, Rotterdam. Latharn, M. (1994). Constructing the Team, Final Report On Joint Review of Procurement And Contractual Agreements in The UK Construction Industry. HMSO, London. Lean Construction Institute (LCI) (2009). Available at http:llwww.leanconstruction.org/ Lennard, D., Crane, A., Beaton, I., Burton, R., Evans, D. & Gould, I. (2002). Integrating the Team; Dream or Reality? Liverpool: Liverpool Best Practice Club/Rethinking Construction North West. Love, P. E. D. & Irani, Z. (2003) A project Management Quality Cost Information System for the Construction Industry. Journal of Information Management, Elsevier. Vo1.40, issue 7, Aug 2003, pp 649-661 Love, P. E. D., Gunasekaran, A. & Li H. (1998) Concurrent Engineering: A Strategy for Procuring Construction Projects. International Journal of Project Management, Vol. 16(6):375-383. Lowe, J. G., (1993). Construction Productivity, An Input-Output Approach, Ph D Thesis, Heriot-Watt University, Edinburgh. Macaulay, S. & Cook, S. (1995). Practical Teamwork for Customer Service. Team Performance Management 1(3), 35-41. Mahdi, I. M. & Alreshaid, K. (2005). Decision Support System for Selecting the Proper Project Delivery Method Using Analytical Hierarchy Process (AHP). International Journal of Project Management. Maslin-Prothero, S. E. & Bennion, A. E. (2010). Integrated Team Working: A Literature Review, International Journal of Integrated Care, Vol. 10, April - June. Mat, S., Sopian K., Mokhtar M., Ali B., Hashim H.S., Rashid, A. K. A. & Zain, M.F.M. (2009). Managing Sustainability in Universiti Kebangsaan Malaysia. Mat, S., Sopian, K., Mokhtar, M., Ali, B., Hashim, H. S., Rashid, A. K. A., ... Abdullah, N. G. (2009). Managing Sustainable Campus in Malaysia - Organisational Approach and Measures. European Journal of Social Sciences, 8(2), 201-214. Masterman, J. W. E. (1992). An Introduction to Building Procurement Systems. London: E & FN Spon Press. Masterman, J. W. E. (2002). Introduction to Building Procurement Systems, (2nd ed.) London: E & FN Spon Press. Mason, J. (2002). Qualitative Researching, (2nd ed.) Sage Publications, London. Matthews, 0. & Howell, G.A. (2005). Integrated Project Delivery an Example of Relational Contracting, Lean Construction Journal, Vol. 2, 1st April. McCauley, B., Hore, A., West, R., & Kehily, D. (2013). Addressing The Need to Reform Construction Public Procurement in Ireland Through The Implementation of Building Information Modelling. Research Development and Practice in Structural Engineering and Construction, 1-6. Available at: https://works.bepress.com/fiacramcdonnell/l2/ McDonnell, F. P. (2015). Integrated Project Delivery A Focus on Integrated Project Delivery, The Enablers for This Process, and the Challenges and Barriers to IPD Within an Irish Context. Papers for University of Salford(2015) Available at: http://works.bepress.com/fiacramcdonnell/l2/ McGeorge, D. & Palmer, A. (2002). Construction Management New Directions. (2"d ed.). Wiley-Blackwell. United Kingdom. Mishra, R.C. (2006). Modem Project Management. New Age International. p. 234. ISBN 978-81-224-1616-9. Mohamad, I. M. (1999). The Application of Concurrent Engineering Philosophy to the Construction Industry. (Thesis PhD, Loughborough University). MoHE. (2007). National Higher Education Action Plan 2007-2010.In M. o. H. Education (Ed.). Putrajaya. MoHE. (2011). Data of Higher Education Institutions Dec. 2011. Access on 26/5/15 (http://www.mohe.gov.my/web_statistik/ perangkaan2011/BAB1-1PTA.pdf) MoHE. (20 13). Perangkaan Pendidikan Negara: Sektor Pengaj ian Tinggi 2013. Available at: http://www.mohe.gov.my/web_ statistik/Perangkaan-2013.udf Moore, D. R., & Dainty, A. R. (2001). Intra-Team Boundaries As Inhibitors of Performance Improvement in UK Design and Build Projects: A Call for Change. Construction Management & Economics, 19(6), 559-562. Moore, J., Pagani, F., Quayle, M., Robinson, J., Sawada, B., Spiegelman, G., & Van Wynsberghe, R. (2005). Recreating the University from Within: Collaborative Reflections on the University of British Columbia's Engagement with Sustainability. International Journal of Sustainability in Higher Education, 6(1), 65-80. Mossman, A., Ballard, G. & Pasquire (2010) Integrated Project Delivery - Innovation in Integrated Design and Delivery. Draft for the Architectural Engineering and Design Management. MPC, (2010) Sustainable Development Initiatives in Malaysia. ISBN 978-983-2025-72-6 July 2010. Published by Malaysia Productivity Corporation (MPC). Available at: http://www.mpc.gov.my/wp_content/uploads/2016/ 04/Sustainable-Development-Initiatives-In-Malaysia.pdf Narayanan, S. P., Idrus, A. B., & Ramanathan, C. T. (2011). Managing Risk Constraints of Multiple Design & Build Projects. Sustainable Building and Infrastructure Systems: Our Future Today, 115. National Association of State Facilities Administrators, Construction Owners Association of American, Association of Higher Education Facilities Officers, Associated General Contractors, and AIA (2010). Integrated Project Delivery for Public and Private Owners. Retrieved from http://www.agc.org/cs/industry_topics/project_ delivery. National Research Council, Policy Division, Board on Sustainable Development (1999). Our Common Journey: A Transition toward Sustainability. Washington, DC: National Academy Press, 22. Nawi, M.N. M., Lee, A., Azman, M. N. A. & Kamar, K. A. M. (2014) Fragmentation Issue in Malaysian Industrialised Building System (IBS) Projects. Journal of Engineering Science and Technology Vol. 9, No. 1 (2014) 97 - 106 © School of Engineering, Taylor's University Nawi, M. N. M., Nifa, F. A. A. & Ahmed, V. (2014). A Review of Traditional Project Procurement Towards Integrated Practice, American-Eurasian Journal of Sustainable Agriculture, 8 (2), 65-70. Nawi, M. N. M., Mohammed, O. & Nifa, F. A. A. (2012). Integrated Project Delivery: A Team Effort to Reduce A Fragmentation Issue That Affect to The Implementation of Industrialised Building System (IBS) in Malaysian Construction Industry. The Quantity Surveyor International Convention (QSIC 2012) 25th& 26th September 2012 Nawi, M. N. M., Lee, A. & Nor, K. M. (2011). Barriers to The Implementation of Industrialised Building System (IBS) in Malaysia. The Built and Human Environment Review: online journal, Volume 4, University of Salford, United Kingdom. Nawi, M. N. M., Arif, M. & Lee, A. (2010). The IBS Barriers in the Malaysian Construction Industry: A Study in Construction Supply Chain Perspective. Proceedings in CIB World Building Congress 2010, 10th - 13th May, the Lowry, Salford Quays, UK. Nawi, M. N. M., Elias, E. M. Hamid, M. S. A., & Yusoff, M. N. (2005). A Study of IBS Formwork Usage in the Malaysian Construction Industry. Proceeding in National Seminar on Engineering Support Course, University Malaysia Perlis, Malaysia. Nawi, M. N. M., Nifa, F. A. A. & Ahmed, V. (2014). A Review of Traditional Project Procurement Towards Integrated Practice, American-Eurasian Journal of Sustainable Agriculture, 8(2), 65-70. Nejati, M., Shahbudin, A. S. M., & Amran, A. (2011, October). Barriers to Achieving A Sustainable University in the Perspective of Academicians. In The 9th AAM International Conference 2011 (Pp. 14-16). Newman, B. (1991). An Open Discussion of Knowledge Management. Available at: www.krn-forum.org/what_is.htm. Nifa, F. A. A., Nawi, M. N. M., & Rahim, S. A. (2014, May). An IPD Framework for Sustainable Design in UUM Campus Development. In Technology Management and Emerging Technologies (ISTMET), 2014 International Symposium on (Pp. 291-295). IEEE. Nifa, F. A. A. & Ahmed, V. (2014). Process Innovation in Partnering: A Framework for Aligning Organizational Cultures in the Malaysian Construction Industry. Proceedings of the 2014 IEEE ICMIT, 978-1-4799-5529-9/14/$31.00 ©2014 IEEE Nifa, F. A. A., Nawi, M. N. M., Musa, S. & Osman, W. N. W. (2013). Integrated project delivery approach for sustainability in design and cost savings: A framework for JPP UUM. Procs Joint International Conference on Nanoscience, Engineering and Management (BOND21), 19-22 August 2013, Penang, Malaysia, UNIMAP. Nifa, F. A. A. & Ahmed, V. (2010). Effective Partnering in Construction - A Critical Literature Review. In: Abu Bakar, A.H. (Ed) Proceedings 4th International Conference on Built Environment in Developing Countries, 1-2 December 2010, Penang, Malaysia, 95-106. Nifa, F. A. A. & Ahmed, V. (2009). The Role of Organizational Culture in Construction Partnering to Produce Innovation. In: Egbu, C. (Ed) Procs 26th Annual ARCOM Conference, 6-8 September 201 0, Leeds, UK, Association of Researchers in Construction Management (ARCOM), 725-734. O'Connor, J. P. (2009). Integrated Project Delivery: Collaboration through New Contract Forms. Ofori, G. (2000). Greening the Construction Supply Chain in Singapore. European Journal of Purchasing and Supply Management, Vol 6 (3-4): 195-206. Osman, W.N., Udin Z. M. & Salleh, D. (2012). Adoption Level of Sustainable Construction Practices: A Study on Malaysia's Construction Stakeholders. Journal of Southeast Asian Research, 2012, 1. Osman, W.N., (2013). Critical Success Factors For The Implementation Of Environmental Management Practices: A Study On The Malaysian Construction Stakeholders. Unpublish Thesis PhD Universiti Utara Malaysia. Pakkala, P. (2002). Innovative Project Delivery Methods for Infrastructure. Finnish Road Enterprise, Helsinki, 19. Perlburg, B. E. (2009). Contracting for Integrated Project Delivery: ConsensusDocs, presented at The 48'h Annual Meeting of Invited Attorneys, Victor 0. Schinnerer& Company, hc. Powal, A. & Hewage, N. K. (2013). Building Information Modeling (BIM) Partnering Framework for Public Construction Projects. Presley, A. & Meade, L. (2010). Benchmarking for Sustainability: An Application to the Sustainable Construction Industry; Benchmarking. An International Journal, Vol. 17 No. 3, pp. 435-51 Proverbs, D. G., Holt, G. D., & Cheok, H. Y. (2000, September). Construction Industry Problems: The Views of UK Construction Directors. In 16th Annual ARCOM Conference (Pp. 73-81). Pulaski, M. H., Horman, M. J., & Riley, D. R. (2006). Constructability practices to manage sustainable building knowledge. Journal of Architectural Engineering, 12(2), 83-92. Rahim, A. A., Fizri, F. F. A., Koshi, K. C., Othman, M., MdNor, N. Sibly, S. (2012) Sustainability-led Institution: Case of Universiti Sains Malaysia, Penang. ProsPER.Net Joint Research Project: Development of Learning Materials and Methodological Support on Sustainable Production and Consumption. Raisbeck, P., Millie, R., & Maher, A. (2010). Assessing Integrated Project Delivery: A Comparative Analysis Of IPD and Alliance Contracting Procurement Routes. Management, 1019, 1028. Raskin , P., Banuri, T., Gallopin, G., Gutman, P., Hammond, A., Kates, R. & Swart. R. (2002) Great Transition: The Promise and Lure of the Times Ahead. Boston: Stockholm Environment Institute. Razak, A. D. (2008). Transforming Higher Education for a Sustainable Tomorrow.( A. D. Razak, & R. Mohamed, Eds.) Pustaka Negara Malaysia, Universiti Sains Malaysia. Retherford, N. (1988). Project Delivery and the U. S. Department of State.Jouma1 of Management in Engineering, VoI. 14 (6): 55-58. Ritz, J. G. (1994). Total Construction Project Management. International Edition. McGraw-Hill, New York. Roberts, C., & Westville, I. N. (2008). Developing Future Leaders: The Role of Reflection in the Classroom. Journal of Leadership Education, 7(1), 116-130. Rubin, H.J. & Rubin, I.S. (2005). Qualitative Interviewing: The Art of Hearing Data. (2nd ed.) SAGE Publications Ltd. Russell, J. S., Swiggum, K. E., Shapiro, J. M. & Alaidrus, A. F. (1994). Constructability Related to TQM, Value Engineering & Cost/ Benefit. Journal of Performance of Construction Facilities, Vol8 (1) February. Saadatian, O., Lim, C., Bakhtyar, B., & Sopian, K. (2012). Sustainable Campus in Malaysia. Available at SSRN: http://ssrn.com/abstract= 2195003 or http://dx.doi.org/l0.2139/ssrn.2195003 Saadatian, O., Salleh, E., Tahir, 0. M., Haw, L.C. & Sopian K. (2011). A Survey On Campus Sustainability Assessment Framework (CSAF) In Malaysia. Journal Design & Built. Volume 4, 2011. ISSN: 1985-6881.PP.9-22 Sakal, M. W. (2005). Project Alliancing: a Relational Contracting Mechanism for Dynamic Projects. Lean Construction Journal, 2(1), 67-79. Salama, M. & Hana, A. R (2010). Green Buildings and Sustainable Construction in The United Arab Emirates. In: Egbu, C. (Ed) Procs 26th Annual ARCOM Conference, 6-8 September 20 10, Leeds, UK, Association of Researchers in Construction Management, 1397-1405. Sanvido, V. E., & Konchar, M. D. (1999). Selecting Project Delivery Systems: Comparing Design-Build, Design-Bid-Build and Construction Management At Risk. Project Delivery Institute. Sarantakos, S. (2005) Social Research, 3rd ed. Palgrave MacMillan Ltd. Saunders, M., Lewis, P. & Thornhill, A. (2009). Research Methods for Business Students. 5th ed. Harlow: Pearson Education Ltd. Saunders, M., Lewis, P, & Thornhill, A. (2003). Research Methods for Business Students, Pearson Education Limited. Scarnati, J. T. (2001). On becoming a team. Team Performance Management 7(2/1), 5-10. Schreier, M. (2012). Qualitative Content Analysis in Practice. Sage Publications. Scott, L. M., Flood, C. & Towey, B. (2013). Integrated Project Delivery for Construction. In 49th ASC Annual International Conference Proceedings, Copyright 2013 by the Associated Schools of Construction. Sekaran, U. (2003). Research Methods for Business: A Skill Building Approach. 4th ed. John Wiley & Sons (Asia) Pte. Ltd. Setiawan, W. & Sutrisna, M. (2010). Investing the Potential of Built environment in Promoting Social Cohesion Within an Urban Environment. In EGBU, C. & Lou, E. (eds.) 16th Annual Conference of Association of Researchers in Construction Management (ARCOW. Leeds, Association of Researchers in Construction Management (ARCOM). Sexton, M. (2003) A Supple Approach to Exposing and Challenging Assumptions and Path Dependencies in Research. In: Keynote speech of the 3rd International Postgraduate Research Conference. Schreier, M. (2012). Qualitative Content Analysis in Practice. Sage Publication Ltd. London. Sharp, L. (2002). Green Campuses: The Road From Little Victories to Systemic Transformation. International Journal of Sustainability in Higher Education, 3(2), 128-145. Sharp, L. (2009). Higher Education: The Quest for the Sustainable Campus. Sustainability: Science, Practice, & Policy, 5(1). Shriberg, M., & Harris, K. (2012). Building Sustainability Change Management and Leadership Skills In Students: Lessons Learned From "Sustainability and the Campus" at the University of Michigan. Journal of Environmental Studies and Sciences, 2(2), 154-164. Simpson, W. (2003). Energy Sustainability and the Green Campus. Planning for Higher Education, 31(3), 150-58. Singleton, M. S. & Hamzeh F. R. (2011). Implementing Integrated Project Delivery on Department of the Navy Construction Project. Sive, T. (2009). Integrated Project Delivery: Reality and Promise, A Strategist's Guide to Understanding and Marketing 1PD.Sociefy for Marketing Professional Services Foundation White Paper on IPD. Smith, J. A. (2003). Validity and qualitative psychology. Qualitative Psychology: A Practical Guide to Research Methods, 232-235. Smith, R. E., Mossman, A. & Emmitt, S. (2011). Editorial: Lean and Integrated Project Delivery Special Issue, Lean Construction Journal, 01-16. Retrieved from http://www.leanconstruction.org/media/docs/lcj/2011/LCJ_11_sp1.pdf Song, L., Mohamed, Y. & Abou Rizk, S. M. (2009). Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance. Journal of Management in Engineering @ ASCE, Vol. 25 (1). Sohn, L. B. (1973). The Stockholm Declaration on The Human Environment. From Harvard International Law Journal, Volume 14, Number 3 Summer 1973. Sonnenwald, D.H. (1996). Communication Roles That Support Collaboration During The Design Process, Design Studies, Vol. 17 (3) July. Strategic Forum for Construction (2003). The Integration Toolkit Guide: Integrated Project Team, London: Strategic Forum for Construction. Sundaraj, G. (2006). The Way Forward: Construction Industry Master Plan 2006-2015. Bulletin of Institution of Engineers, Malaysia, Sept - Nov. Sutton, P. (2004). A perspective on Environmental Sustainability. Paper on the Victorian Commissioner for Environmental Sustainability. Sutrisna, M. (2009). Reserch Methodology in Doctoral Research: Understanding the Meaning of Conducting Qualitative Research ARCOM doctoral workshop at LiverpooI John Moores University on 12 May. Tarricone, P. & Luca, J., (2002). Employees, Teamwork and Social Interdependence - A Formula for Successful Business? Team Performance Management 8 (3/4), 54-59. Teicholz, P. (2004). Labor Productivity Declines in the Construction Industry: Causes and Remedies. AECbytes Viewpoint, #4. Teicholz, P., Goodrum, P. M., & Haas, C. T. (2001). US Construction Labor Productivity Trends, 1970-1998." Journal Construction Engineering Management, 127 (5). Thomashow, M. (2014). The Nine Elements of a Sustainable Campus. Sustainability: The Journal of Record, 7(3), 174-175. Thomsen, C., Darrington, J., Dunne, D., & Lichtig, W. (2009). Managing Integrated Project Delivery. Construction Management Association of America (CMAA), McLean, VA, 105. Trigunarsyah, B. (2006). Case Studies on Implementation of Constructability Improvement by Construction Project Owners in Indonesia. In Brown, Kerry and Hampson, Keith and Brandon, Peter, Eds. Proceedings Clients Driving Innovation: Moving Ideas into Practice, Gold Coast, Australia. UKCG Report, (2009). Construction in the UK Economy: The Benefits of Investment, UK Contractors Group, Construction in the UK economy. United Nations, New York, (2007). Indicators of Sustainable Development: Guidelines and Methodologies. Third Edition. Valipoor, S. & Ujang, B. (2011). Challenges of Sustainable Design in Malaysian Furniture Industry, International Conference on Environment and Industrial Innovation IPCBEE vol. 12 (2011) © (2011) IACSIT Press, Singapore Van Wyk, L. (2004). A Review of the South African Construction Industry Part 2: Sustainable Construction Activities. Pretoria, South Africa: CSIR Boutek. Available at: http://www.csir.co.za/akani Van Wyk, L. (2003). A Review Of The South African Construction Industry. Part 1: Economic, Regulatory and Public Sector Capacity Influences on the Construction Industry. Boutek, CSIR (Council for ScientiJic and Industrial Research), Pretoria. Velazquez, L., Munguia, N., Platt, A., & Taddei, J. (2006). Sustainable university: what can be the matter?. Journal of Cleaner Production, 14(9), 810-819. Venetoulis, J. (2001). Assessing the Ecological Impact of a University The Ecological Footprint for the University of Redlands. International Journal of Sustainability in Higher Education, Vol. 2 No. 2, 2001, pp. 180-196. MCB University Press, 1467-6370 Vouvaki D. and Anastasios X. (2008). Changes in Social Welfare and Sustainability: Theoretical Issues and Empirical Evidence. Ecological Economics. Doi: 10.1016. Vrijhoef, R. & Koskela, L. (2000). The Four Roles of Supply Chain Management in Construction. European Journal of Purchasing & Supply Management, 6, pp. 169-178. Vrijhoef, R. & Koskela, L. (1999). Roles of Supply Chain Management in Construction, Proceedings IGLC-7, University of California, Berkeley, CA, USA. Vyse, S. (2001). Fusion: A New Approach to Working, London: GlaxoWelleome. Walker, C. T., & Smith, A. J. (1995). Privatized infrastructure: The Build Operate Transfer Approach. Thomas Telford. Wainwright, D. W., & Waring, T. S. (2007). The Application and Adaptation Of A Diffusion Of Innovation Framework for Information Systems Research in NHS General Medical Practice. Journal of Information Technology, 22(1), 44-58. Wright, T. S. A. (2002). Definitions and Frameworks for Environmental Sustainability in Higher Education. International Association of Universities. Published by Elsevier Science Ltd. Wan Nur'ashiqin, W.M., Nuraziah, A., Novel, A. & Buang, A. (2011). Diagnosing Knowledge, Attitudes and Practices for a Sustainable Campus. World Applied Scinces Journal 13 (Sustainable Development Impact from the Socio- Enviromental Perspectives): 93-98. Wilde Sapte LLP Denton (2006). Public Private Partnerships: Bot Techniques and Project Finance. London: Euromoney Books. p. 224. ISBN 978-1-84374-275-3. Windapo, A. O., & Cattell, K. (2013). The South African Construction Industry: Perceptions of Key Challenges Facing Its Performance, Development and Growth. Journal of Construction in Developing Countries, 18(2), 65. Woods, P. (2011). Sociology and the School (Vol. 209). Routledge. Wong, P. & Cheung, S. (2004). Trust in Construction Partnering: Views From Parties of the Partnering Dance. International Journal of Project Management, 22, 437-446. doi: 10.1016/j.ijproman.2004.01.001 Yamazaki, Y., Tabuchi, T., Kataoka, M. & Shimazaki, D. (2014) 3D/BIM Applications to Large-scale Complex Building Projects in Japan, International Journal of High-Rise Buildings. December 2014, Vol 3, 311-323. Yates, J. K. (2013). Sustainable Methods for Waste Minimisation in Construction. Construction Innovation. Vol. 23 No. 3, 2013 pp 281-301 Yeang, K. (2008). Ecodesign: a Manual for Ecological Design. Wiley and Sons. Yin, R. K. (2011). Qualitative Research: From Start to Finish. The Guildford Press, New York. Yin, R. K. (2009) Case Study Research: Design and Methods, (4th ed.). California, London, SAGE. Yu, A. T., Poon, C. S., Wong, A., Yip, R., & Jaillon, L. (2013). Impact of Construction Waste Disposal Charging Scheme on Work Practices at Construction Sites in Hong Kong. Waste management, 33(1), 138-146. Zahrizan Z., Ali N. M., Haron A. T., Marshall-Ponting A. & Hamid Z. A. (2013). Exploring The Adoption Of Building Information Modelling (BIM) in The Malaysian Construction Industry: A Qualitative Approach. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-11631 pISSN: 2321-7308 Zakaria, Z., Mohamed Ali, N., Tarmizi Haron, A., Marshall-Ponting, A. J., & Abd Hamid, Z. (2013). Exploring the Adoption of Building Information Modelling (BIM) in the Malaysian Construction Industry: A qualitative approach. International Journal of Research in Engineering and Technology,2(8), 384-395.