Impact of project and organizational related factors on project performance of construction companies in Malaysia

The objective of this study was to examine and investigate the impact of project-related factors and organizational-related factors on the project performance of construction companies in Malaysia. The performance of construction companies is crucial for the economic development of the count...

Full description

Saved in:
Bibliographic Details
Main Author: Gopal, Sekar
Format: Thesis
Language:eng
eng
Published: 2017
Subjects:
Online Access:https://etd.uum.edu.my/6775/1/s95596_01.pdf
https://etd.uum.edu.my/6775/2/s95596_02.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-uum-etd.6775
record_format uketd_dc
institution Universiti Utara Malaysia
collection UUM ETD
language eng
eng
advisor K.V.S.N Viswanathan, K. Kuperan
topic HD28-70 Management
Industrial Management
spellingShingle HD28-70 Management
Industrial Management
Gopal, Sekar
Impact of project and organizational related factors on project performance of construction companies in Malaysia
description The objective of this study was to examine and investigate the impact of project-related factors and organizational-related factors on the project performance of construction companies in Malaysia. The performance of construction companies is crucial for the economic development of the country and there are various factors which affect their performance. Past studies on project performance have been skewed towards project- related factors such as client, contractor, consultant, material, labor and equipment, contract, external and project management tools/techniques. Through the literature review, it was noticed that a research gap exists, whereby, for the success of a project, not only are project-related factors important, organizational-related factors are important too. Taking a lead from here, the most important organizational-related factors, such as leadership, organizational culture, innovation and learning organization were chosen and used in this study to examine and investigate the impact of these organizational factors on project performance. A pilot study was carried out and the instrument reliability was ascertained. The population for this study was the construction companies in Malaysia registered with the Construction Industry Development Board (CIDB) under the Grade 7 category. This quantitative study was carried out with a survey questionnaire. 1,071 questionnaires were sent to project managers of construction companies and 360 responses were received with a response rate of 33.61%. The collected data were analyzed using the Statistical Package for Social Science version 22 (SPSS) for descriptive, reliability, validity and relative importance index analysis. The results of the study indicate that organizational-related factors have a greater significant impact on project performance over project-related factors. Thus, the outcome of the study is useful for the construction industry practitioners to understand the importance of organizational factors and to implement them in their organizations to improve project performance
format Thesis
qualification_name other
qualification_level Doctorate
author Gopal, Sekar
author_facet Gopal, Sekar
author_sort Gopal, Sekar
title Impact of project and organizational related factors on project performance of construction companies in Malaysia
title_short Impact of project and organizational related factors on project performance of construction companies in Malaysia
title_full Impact of project and organizational related factors on project performance of construction companies in Malaysia
title_fullStr Impact of project and organizational related factors on project performance of construction companies in Malaysia
title_full_unstemmed Impact of project and organizational related factors on project performance of construction companies in Malaysia
title_sort impact of project and organizational related factors on project performance of construction companies in malaysia
granting_institution Universiti Utara Malaysia
granting_department Othman Yeop Abdullah Graduate School of Business
publishDate 2017
url https://etd.uum.edu.my/6775/1/s95596_01.pdf
https://etd.uum.edu.my/6775/2/s95596_02.pdf
_version_ 1747828115990642688
spelling my-uum-etd.67752021-05-09T02:49:44Z Impact of project and organizational related factors on project performance of construction companies in Malaysia 2017 Gopal, Sekar K.V.S.N Viswanathan, K. Kuperan Othman Yeop Abdullah Graduate School of Business Othman Yeop Abdullah Graduate School of Business HD28-70 Management. Industrial Management The objective of this study was to examine and investigate the impact of project-related factors and organizational-related factors on the project performance of construction companies in Malaysia. The performance of construction companies is crucial for the economic development of the country and there are various factors which affect their performance. Past studies on project performance have been skewed towards project- related factors such as client, contractor, consultant, material, labor and equipment, contract, external and project management tools/techniques. Through the literature review, it was noticed that a research gap exists, whereby, for the success of a project, not only are project-related factors important, organizational-related factors are important too. Taking a lead from here, the most important organizational-related factors, such as leadership, organizational culture, innovation and learning organization were chosen and used in this study to examine and investigate the impact of these organizational factors on project performance. A pilot study was carried out and the instrument reliability was ascertained. The population for this study was the construction companies in Malaysia registered with the Construction Industry Development Board (CIDB) under the Grade 7 category. This quantitative study was carried out with a survey questionnaire. 1,071 questionnaires were sent to project managers of construction companies and 360 responses were received with a response rate of 33.61%. The collected data were analyzed using the Statistical Package for Social Science version 22 (SPSS) for descriptive, reliability, validity and relative importance index analysis. The results of the study indicate that organizational-related factors have a greater significant impact on project performance over project-related factors. Thus, the outcome of the study is useful for the construction industry practitioners to understand the importance of organizational factors and to implement them in their organizations to improve project performance 2017 Thesis https://etd.uum.edu.my/6775/ https://etd.uum.edu.my/6775/1/s95596_01.pdf text eng public https://etd.uum.edu.my/6775/2/s95596_02.pdf text eng public other doctoral Universiti Utara Malaysia Abdul Rashid, Z., Sambasivan, M., & Abdul Rahman, A. (2004). The influence of organizational culture on attitudes toward organizational change. Leadership & Organization Development Journal, 25(2), 161-179. Abdul Rashid, Z., Sambasivan, M., & Johari, J. (2003). The influence of corporate culture and organizational commitment on performance. Journal of Management Development, 22(8), 708-728. Alaghbari, W., Kadir, M.R.R., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Journal of Engineering, Construction and Architectural Management, 14(2), 192-206. Anantamula, V.S. (2010). Project manager’s leadership role in improving project performance. Engineering Management Journal (EMJ), 22(1), 13. Andersen, E.S. (2016). Do project managers have different perspectives on project management?. International Journal of Project Management, 34(1), 58-65. Angus, G.Y., Flett, P.D., & Bowers, J.A. (2005). Developing a value-centered proposal for assessing project success. International Journal of Project Management, 23(6), 428-436. Antonakis, J., Avolio, B. J., & Sivasubramaniam, N. (2003). Context and leadership: An examination of the nine-factor full-range leadership theory using the Multifactor Leadership Questionnaire. The Leadership Quarterly, 14(3), 261-295. Argyris, C., & Schön, D.A. (1997). Organizational learning: A theory of action perspective. Reis, 345-348. Argyris, C., Bellman, G.M., Blanchard, K., & Block, P. (1994). The future of workplace learning and performance. Journal of Training & Development, 48(5), 12. Armstrong, J.S., & Overton, T.S. (1977). Estimating non-response bias in mail surveys. Journal of Marketing Research, 396-402. Assaf, S.A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, 349-357. Atkinson, R. (1999). Project management: Cost, time and quality, Two best guesses and a phenomenon, it’s time to accept other success criteria. International Journal of Project Management, 17(6), 337-342. Bank Negara Malaysia. (2015). Household debt to GDP, the 2014 Bank Negara Malaysia Annual Report. retrieved on-line on November, 2015. www.bnm.gov.my. Belassi, W., & Tukel, O.I. (1996). A new framework for determining critical success/failure factors in projects. International Journal of Project Management, 14(3), 141-151. Belout, A., & Gauvreau, C. (2004). Factors influencing project success: The impact of human resource management. International Journal of Project Management, 22, 1-11. Bentley & Borman. (2001). Project management quotes collection. 960. retrieved on-line on November, 2016. http://2020projectmanagement.com/2015/02/top-25- project-management-quotes/. Brady, T., & Davies, A. (2004). Building project capabilities: From exploratory to exploitative learning. Journal of Organization Studies, 25(9), 1601-1621. Bronte, S.M. (2015). Beyond the Iron Triangle: Evaluating Aspects of Success and Failure using a Project Status Model. Journal of Computing & Information Systems, 19(2). Burati Jr, J. L., Farrington, J. J., & Ledbetter, W. B. (1992). Causes of quality deviations in design and construction. Journal of construction engineering and management, 118(1), 34-49. Burns, J.M. (1998). Transactional and transforming leadership. Leading organizations, 133-134. Bursa Malaysia. (2015). Malaysian construction sector 2015 outlook, Bursa Malaysia Stock Market Analysis Digest. retrieved on-line on November, 2015. www.klse- online.blogspot.com. Calvert, G., Mobley, S., & Marshall, L. (1994). Grasping the learning organization. Journal of Training & Development, 48(6), 38. Carrillo, P. (2005). Lessons learned practices in the engineering, procurement and construction sector. Journal of Engineering, Construction and Architectural Management, 12(3), 236-250. Cheung, S.O., Suen, H.C., & Cheung, K.K. (2004). PPMS: A web-based construction project performance monitoring system. Journal of Automation in Construction, 13(3), 361-376. Chong, H.Y., & Low, T.S. (2014). Accidents in Malaysian construction industry: Statistical data and court cases. International Journal of Occupational Safety and Ergonomics, 20(3), 503-513. Cicmil, S., & Hodgson, D. (2006). New possibilities for project management theory: A critical engagement. Project Management Journal, 37(3), 111. CIDB Malaysia. (2015). Lembaga Pembangunan Industri Pembinaan Malaysia, Directory of registered contractors. retrieved on-line on November, 2015. www.cidb.gov.my. Construction industry transformation program (2015), Construction Industry Development Board, Malaysia. retrieved on-line on November, 2015. http://www.cidb.gov.my/cidbv5/index.php/ warga-cidb. Davies, C.T. (2002). The ‘‘real’’ success factors on projects. International Journal of Project Management, 20, 185-190. De Oliveira, M.A., Oliveira, L.V.D.V., & Possamai, O. (2012). Forecasting project performance considering the influence of leadership style on organizational agility. International Journal of Productivity and Performance Management, 61(6), 653-671. De Valence, G. (2010). Innovation, Procurement and Construction Industry Development. Australian Journal of Construction Economics and Building, 10(4), 50-59. Diugwu, I.A., Mohammed, M., & Baba, D.L. (2015). Towards effective infrastructure development in Nigeria: Theoretical considerations from a project management perspective. American Journal of Industrial and Business Management, 5(04), 172. Dubois, A., & Gadde, L.E. (2002). The construction industry as a loosely coupled system: Implications for productivity and innovation. Journal of Construction Management and Economics, 20(7), 621-631. Elcosh. (2012). Health and safety aspects, Rate of deaths from injuries in construction, selected countries, retrieved on-line on October, 2015. https://www.google.com/search?q= rate+of+deaths+from+injuries+in+construction,+ selected+countries. Elkjaer, B. (2001). The learning organization: An undelivered promise. Essential readings in Management Learning, 32(4), 437-452. Endut, I. R., Akintoye, A., & Kelly, J. (2009). Cost and time overruns of projects in Malaysia. retrieved on-line on August, 21, 2015, 243-252. Fernandes, C.I., Ferreira, J. J.M., & Raposo, M. (2013). Drivers to firm innovation and their effects on performance: An international comparison. International Entrepreneurship and Management Journal, 9(4), 557-580. Fichtner, C. (2012). Project management quotes. retrieved on-line on November, 2016. http://sourcesofinsight.com/project-management-quotes/. Garvin, D.A. (1985). Building a learning organization. Organizational Development & Training, 274. Gerwick, C. (2002), Construction of marine and offshore structures. CRC press. Ghazimoradi, M., Kheyroddin, A., & Rezayfar, O. (2016). Diagnosing the success of the construction projects during the initial phases. Decision Science Letters, 5(3), 395-406. Global Construction Report 2020. (2009). retrieved on-line on November, 2015. http://www.building.co.uk/Journals/Builder_Group/Building/13_November_2009/attachments/global_ construction2020.pdf. Gordon, J. (1992). Performance technology: Blueprint for the learning organization?. Journal of Training and Development, 29(5), 27. Gross domestic product. (2015). Malaysia statistics. retrieved on-line on January, 2016. www.worldbank.org. Hair, J. F., Anderson, R. E., Babin, B. J., & Black, W. C. (2010). Multivariate data analysis: A global perspective (Vol. 7). Upper Saddle River, NJ: Pearson. Hamzah, N., Khoiry, M. A., Arshad, I., Wan Badaruzzaman, W. H., & Tawil, N. M. (2012). Identification of the causes of construction delay in Malaysia. In Proceedings of World Academy of Science, Engineering and Technology (No. 72, p. 614). World Academy of Science, Engineering and Technology (WASET). Hansen, G.S., & Wernerfelt, B. (1989). Determinants of firm performance: The relative importance of economic and organizational factors. Strategic management journal, 10(5), 399-411. Hardless, C., Nilsson, M., & Nuldén., U. (2005). 'Copernicus': Experiencing a failing project for reflection and learning. Journal of Management Learning, 36(2), 181-217. Hashi, I., & Stojčić, N. (2013). The impact of innovation activities on firm performance using a multi-stage model: Evidence from the Community Innovation Survey 4. Research Policy, 42(2), 353-366. Haniff, A., & Ogunlana, S.O. (2012). Strategic alignment within a TMO: Perceptions of project success. Henri, J.F. (2006). Organizational culture and performance measurement systems. Journal of Accounting, Organizations and Society, 31(1), 77-103. Hinze, J., & Tracey, A. (1994). The contractor-subcontractor relationship: the subcontractor's view. Journal of Construction Engineering and Management, 120(2), 274-287. Hsich, T. (2014). Project management quotes. retrieved on-line on November, 2016. https://www.pinterest.com/wriketeam/project-management-quotes/. Huang, C.J., & Liu, C.J. (2005). Exploration for the relationship between innovation, IT and performance. Journal of Intellectual Capital, 6(2), 237-252. Hussein, B.A., Ahmad, S.B., & Zidane, Y.J. (2015). Problems associated with defining project success. Procedia Computer Science, 64, 940-947. Hyvari, I. (2006). Success of projects in different organizational conditions. Project Management Journal, 37(4), 31. Ifast (2014). 2015 Outlook for Malaysia. Research Report. retrieved on-line on November, 2015. http://www.fundsupermart.com.my/. Jabatan Laut Malaysia. (2015). List of Malaysian containers, oil tankers and fishing ports. retrieved on-line on November, 2015. www.marine.gov.my. www.mot.gov.my. Jagboro, G.O., & Aibinu, A.A. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593-599. Jha, K. N., & Iyer, K. C. (2006). Critical factors affecting quality performance in construction projects. Total Quality Management and Business Excellence, 17(9), 1155-1170. Jugdev, K., & Müller, R. (2005). A retrospective look at our evolving understanding of project success. Project Management Journal, 36(4), 19-31. Jardine, R., Chow, F., Overy, R., & Standing, J. (2005). ICP design methods for driven piles in sands and clays (p.112). London: Thomas Telford. Kaliprasad, M. (2006). The human factor II: Creating a high performance culture in an organization. Journal of Cost Engineering, 48(6), 27-34. Khan, F.I., & Amyotte, P.R. (2002). Inherent safety in offshore oil and gas activities: a review of the present status and future directions. Journal of Loss Prevention in the Process Industries, 15(4), 279-289. Khang, D.B., & Moe, T.L. (2008). Success criteria and factors for international development projects: A life‐cycle‐based framework. Project Management Journal, 39(1), 72-84. Kim, B.C. (1989). Project scope and project performance: The effect of parts strategy and supplier involvement and product development. Journal of Management Science, 35(10), 1247-1263. Klein, P.G., & Shelanski, H.A., 1996. Transaction cost economics in practice: Applications and evidence. Journal of Market-Focused Management, 1, 281-300. Kometa, S.T., Olomolaiye, P.O., & Harris, F.C. (1994). Attributes of UK construction clients influencing project consultants' performance. Construction Management and Economics Jounal, 12(5), 433-443. Krejcie, R.V., & Morgan, D.W. (1970). Determining sample size for research activities. Educ psychol meas. Koops, L., Coman, L., Bosch-Rekveldt, M., Hertogh, M., & Bakker, H. (2015). Public perspectives on project success – influenced by national culture? Procedia-Social and Behavioral Sciences, 194, 115-124. Koskela, L., & Howell, G. (2002). The theory of project management: Explanation to novel methods. In-Proceedings 10th Annual Conference on Lean Construction, IGLC-10 (Vol. 6, No. 8). Kotter, J. P. (2001). What leaders really do? Harvard business review, 68(3). Kuen, C.W. (2007). Factors influencing the success of project management amongst manufacturing companies in Malaysia: A conceptual framework. 7th Global Conference on Business and Economics. Lee, G., Benoit-Bruyan, J., and Johnson, T. P. (2011). ‘Survey Research in Public Administration: Assessing Mainstream Journals with a Total Survey Error Framework’, Public Administration Review, 72(1), 87-97. Lim, C.S., & Mohamed, M.Z. (1999). Criteria of project success: An exploratory re- examination. International Journal of Project Management, 17(4), 243-248. Ling, F.Y.Y., Low, S.P., Wang, S.Q., & Lim, H.H. (2009). Key project management practices affecting Singaporean firms’ project performance in China. International Journal of Project Management, 27(1), 59-71. Lua, W., Zhang, L., & Pan, J. (2014). Identification and analyses of hidden transaction costs in project dispute resolutions. International Journal of Project Management, in press. Malaysia household debt to GDP. (2013). retrieved on-line on November, 2015. https://www.google.com/search?q=bank+negara+ malaysia+household+debt. Malaysia oil and gas report. (2016), retrieved on-line on November, 2015. https://community.ump.edu.my/ecommstaff/sites/ default/library/subfolders/12780/1/BMI_ Malaysia_Oil__26_Gas_Report_Q12016.pdf. Marzook, M.M., & El-Rasas, T.I. (2014). Analyzing delay causes in Egyptian construction projects. Journal of Advanced Research, 5(1), 49-55. Maserang, S. (2002). Project Management: Tools & Techniques. Retrieved on November, 15, 2013. Memon, A.H., Rahman, I.A., Abdullah, M.R., & Aziz, A.A.A. (2014). Factors affecting construction cost performance in project management projects: Case of MARA large projects. International Journal of Civil Engineering and Built Environment, 1(1), 30-35. Memon, A.H., Rahman, I.A., & Aziz, A.A.A. (2012). Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia. International Journal of Advances in Applied Sciences, 1(1), 45-52. Mišić, S., & Radujković, M. (2015). Critical drivers of megaprojects success and failure. Procedia Engineering, 122, 71-80. Munns, A.K., & Bjeirmi, B.F. (1996). The role of project management in achieving project success. International Journal of Project Management, 14(2), 81-87. Murphy, A., & Ledwith, A. (2007). Project management tools and techniques in high- technology SMEs. Management Research News, 30(2), 153-166. Nixon, P., Harrington, M., & Parker, D. (2012). Leadership performance is significant to project success or failure: A critical analysis. International Journal of Productivity and Performance Management, 61(2), 204-216. Nam, C.H., & Tatum, C.B. (1997). Leaders and champions for construction innovation. Journal of Construction Management & Economics, 15(3), 259-270. Northouse, P.G. (2011). Introduction to leadership concepts and practice, Entrepreneurial leadership questionnaire: 18-item version. Sage Publications Limited. Odeh, A.M., & Battaineh, H.T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67-73. Oil prices. (2015). Brent crude oil prices daily chart. retrieved on-line on October, 2015. https://www.google.com/search?q=oil+price+chart. Oisen, R.P. (1971). "Can project management be defined?". Project Management Quarterly, 2(1), 12-14. Olaniran, O.J. (2015). The effects of cost-based contractor selection on construction project performance. Journal of Financial Management of Property and Construction, 20(3), 235-251. Orlitzky, M., Schmidt, F.L., & Rynes, S.L. (2003). Corporate social and financial performance: A meta-analysis. Journal of Organization Studies, 24(3), 403-441. Over budget projects in comparison, New York Times. (2015). retrieved on-line on November, 2015. www.google.com/search?q=over+budget+ construction+projects&espv. Pinto, J. K., & Slevin, D. P. (1988, June). Critical success factors across the project life cycle. Project Management Institute. PMI. (2000). A guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute, 4(1), 4. Pollack, J. (2007). The changing paradigms of project management. International Journal of Project Management, 25(3), 266-274. Ports in Malaysia. (2015). retrieved on-line on November, 2015. http://www.mot.gov.my/en/ maritime/ports-in-malaysia. Pounder, T. (2009). Using action learning to drive organizational learning and performance. Strategic HR Review, 8(3), 17-23. Puspadevi, S. (2015). Obstacles to construction growth, The Star Online, Business news. retrieved on-line on November, 2015. http://www.thestar.com.my/Business/Business-News/2015/01/02/Obstacles-to- construction-growth. Rate of deaths from injuries in construction, selected countries. (2005). retrieved on-line on November, 2015. https://www.google.com/search?q= global+construction+accident+statistics&esp v. Raza, T., & Michaelb, E. (2001). Use and benefits of tools for project risk management. International Journal of Project Management, 19(9), 17. Report on survey of construction industries. (2014). Key indicators of construction sector, 2012 and 2013. retrieved on-line on November, 2015. www.statistics.gov.my. Reiss, G. (2013). Project management quotes pipe, 728. retrieved on-line on November, 2016. http://www.slideshare.net/Geoffat PerformancePeople/project- management-quotes-pipe-975906. Rogers, E.M. (1983). Diffusion of innovation. New York Free Press, 18(20), 271. Rolstadås, A., Pinto, J.K., Falster, P., & Venkataraman, R. (2015). Project decision chain. Project Management Journal, 46(4), 6-19. Sadkowska, J. (2016). Stakeholders’ risk in project management: Case study of Polish family firms. Journal of Labour Productivity and Outsourcing, 17(6), 257-271. Sambasivan, M., & Soon, Y.W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517-526. Sambasivan, M., Deepak, T.J., Ali, S., & Ponniah, V. (2016). Analysis of delays in Tanzanian Construction Industry: Transaction Cost Economics (TCE) and Structural Equation Modelling (SEM) approach. Engineering, Construction and Architectural Management, ABDC/ERA – A*, Scopus, ISI – Accepted and forthcoming. Saunila, M. (2014). Innovation capability for SME success: Perspectives of financial and operational performance. Journal of Advances in Management Research, 11(2), 163. Schein, E.H. (1990). Organizational culture. Journal of American Psychological Association, 45(2), 109. Sekaran, U., & Bougie, R. (2003). Research methodology for business. Shrnhur, A.J., Levy, O., & Dvir, D. (1997). Mapping the dimensions of project success. Project Management Journal, 28(2), 5-13. Söderlund, J. (2004). Building theories of project management: Past research, questions for the future. International Journal of Project Management, 22(3), 183-191. Song, J.H. (2009). The Dimensions of Learning Organization Questionnaire (DLOQ): A validation study in a Korean context. Human Resource Development Quarterly, 20(1). Subramaniam, A., Othman, R., & Sambasivan, M. (2010). Implicit leadership theory among Malaysian managers: Impact of the leadership expectation gap on leader-member exchange quality. Leadership & Organization Development Journal, 31(4), 351-371. Tawil, N. M., Khoiry, M. A., Arshad, I., Hamzah, N., Jasri, M. F., & Wan Badaruzzaman, W. H. (2013). Factors contribute to delay project construction in higher learning education case study UKM. Research Journal of Applied Sciences, Engineering and Technology, 5(11), 3112-3116. Teas, R.K. (1993). Expectations, performance evaluation and consumers' perceptions of quality. The Journal of Marketing, 18-34. The research advisors (2006). Sample size table. retrieved on-line on November, 2015. www.research-advisors.com. Trigo, V., Calapez, T., & Santos, M.D.C. (2009). SMEs and internationalization: An empirical study of SMEs in Portugal. Economia Global e Gestão, 14(3), 9-24. Truman, D. (2014). Assessment of problems associated with poor project management performance. Long International Inc. International Project Management Arbitrator’s Handbook, 1-34. Turner, J.R., & Müller, R. (2005). The project manager's leadership style as a success factor on projects: A literature review. Project Management Institute. van Berkel, F.J., Ferguson, J.E., & Groenewegen, P. (2016). Speedy delivery versus long- term objectives: How time pressure affects coordination between temporary projects and permanent organizations. Journal of Long Range Planning. van Offenbeek, M.A., & Vos, J.F. (2016). An integrative framework for managing project issues across stakeholder groups. International Journal of Project Management, 34(1), 44-57. Westerveld, E. (2003). The Project Excellence Model®: Linking success criteria and critical success factors. International Journal of Project Management, 21(6), 411-418. Winch, G., 1989. The construction firm and the construction project: A transaction cost approach. Journal of Construction Engineering and Economics, 7(4), 331-345. White, D., & Fortune, J. (2002). Current practice in project management: An empirical study. International Journal of Project Management, 20(1), 1-11. Williamson, O.E. (1989). Transaction cost economics. Handbook of Industrial Organization, 1(135-182). William, W. (2012). Top 10 project management quotes. retrieved on-line on November, 2016. http://sourcesofinsight.com/project-management-quotes/. . World GDP growth rate. (2015). retrieved on-line on November, 2015. http://data.worldbank.org/ indicator/NY.GDP.MKTP.KD.ZG. Wu, T.C., Chen, C.H., & Li, C.C. (2008). A correlation among safety leadership, safety climate and safety performance. Journal of Loss Prevention in the Process Industries, 21(3), 307-318. Xiao, H., & Proverbs, D. (2002). The performance of contractors in Japan, the UK and the USA: An evaluation of construction quality. International Journal of Quality & Reliability Management, 19(6), 672-687.