The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry

<p>The objective of this study is to determine the relationship between 5S lean tool and</p><p>Value Stream Mapping (VSM) towards Warehouse Performance (WP) among</p><p>Malaysian manufacturing industry. A total of 378 responses we...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Fadzil Harun
Format: thesis
Language:eng
Published: 2020
Subjects:
Online Access:https://ir.upsi.edu.my/detailsg.php?det=11610
Tags: Add Tag
No Tags, Be the first to tag this record!
id oai:ir.upsi.edu.my:11610
record_format uketd_dc
spelling oai:ir.upsi.edu.my:116102024-11-07 The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry 2020 Mohd Fadzil Harun <p>The objective of this study is to determine the relationship between 5S lean tool and</p><p>Value Stream Mapping (VSM) towards Warehouse Performance (WP) among</p><p>Malaysian manufacturing industry. A total of 378 responses were received by using</p><p>the online survey with response rate of 15.55%. This study used structural equation</p><p>modeling technique. The results showed the positive and significant direct effect</p><p>between 5S lean tool and WP ((HI =0.628, p<0.001), 5S lean tool and VSM</p><p>(1-12=0.614, p<0.001), VSM and WP (H3=0.269, p<0.05) and lastly the indirect effect</p><p>of VSM (0.165) with p (0.022) <0.05) in the relationship between 5S lean tool and</p><p>WP. Therefore, VSM was partially mediated the relationship between 5S lean tool</p><p>and WP (direct effect= 0.628, pO.OOl, indirect effect=0.165 with p (0.022) <0.05). In</p><p>conclusion, there are positive and significant effect between 5S lean tool and WP, 5S</p><p>lean tool and VSM, VSM and WP and mediating effect of VSM occurs between 5S</p><p>lean tool and WP among Malaysian manufacturing industry. The findings showed that</p><p>Malaysian manufacturing industry can implement 5S lean tool and VSM, and this</p><p>lead to enhance their WP. Thus, the findings are important and useful in increasing</p><p>knowledge to determine 5S lean tool and VSM on WP among Malaysian</p><p>manufacturing industry. The implication of this study is useful to make important</p><p>decisions concerning the 5S lean tool, VSM, and WP in the Malaysian manufacturing</p><p>industry.</p> 2020 thesis https://ir.upsi.edu.my/detailsg.php?det=11610 https://ir.upsi.edu.my/detailsg.php?det=11610 text eng openAccess Doctoral Perpustakaan Tuanku Bainun Fakulti Pengurusan dan Ekonomi N/A
institution Universiti Pendidikan Sultan Idris
collection UPSI Digital Repository
language eng
topic
spellingShingle
Mohd Fadzil Harun
The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
description <p>The objective of this study is to determine the relationship between 5S lean tool and</p><p>Value Stream Mapping (VSM) towards Warehouse Performance (WP) among</p><p>Malaysian manufacturing industry. A total of 378 responses were received by using</p><p>the online survey with response rate of 15.55%. This study used structural equation</p><p>modeling technique. The results showed the positive and significant direct effect</p><p>between 5S lean tool and WP ((HI =0.628, p<0.001), 5S lean tool and VSM</p><p>(1-12=0.614, p<0.001), VSM and WP (H3=0.269, p<0.05) and lastly the indirect effect</p><p>of VSM (0.165) with p (0.022) <0.05) in the relationship between 5S lean tool and</p><p>WP. Therefore, VSM was partially mediated the relationship between 5S lean tool</p><p>and WP (direct effect= 0.628, pO.OOl, indirect effect=0.165 with p (0.022) <0.05). In</p><p>conclusion, there are positive and significant effect between 5S lean tool and WP, 5S</p><p>lean tool and VSM, VSM and WP and mediating effect of VSM occurs between 5S</p><p>lean tool and WP among Malaysian manufacturing industry. The findings showed that</p><p>Malaysian manufacturing industry can implement 5S lean tool and VSM, and this</p><p>lead to enhance their WP. Thus, the findings are important and useful in increasing</p><p>knowledge to determine 5S lean tool and VSM on WP among Malaysian</p><p>manufacturing industry. The implication of this study is useful to make important</p><p>decisions concerning the 5S lean tool, VSM, and WP in the Malaysian manufacturing</p><p>industry.</p>
format thesis
qualification_name
qualification_level Doctorate
author Mohd Fadzil Harun
author_facet Mohd Fadzil Harun
author_sort Mohd Fadzil Harun
title The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
title_short The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
title_full The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
title_fullStr The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
title_full_unstemmed The structural relationship between 5s lean tool, Value Stream Mapping, and Warehouse Performance among Malaysia manufacturing industry
title_sort structural relationship between 5s lean tool, value stream mapping, and warehouse performance among malaysia manufacturing industry
granting_institution Perpustakaan Tuanku Bainun
granting_department Fakulti Pengurusan dan Ekonomi
publishDate 2020
url https://ir.upsi.edu.my/detailsg.php?det=11610
_version_ 1818649099836063744