Hanapi, F. (2015). Defect liability period in the construction contract: Lessons learnt from an institution of higher education (IOHE) building project (IR).
Chicago Style (17th ed.) CitationHanapi, Fait. Defect Liability Period in the Construction Contract: Lessons Learnt from an Institution of Higher Education (IOHE) Building Project (IR). 2015.
MLA引文Hanapi, Fait. Defect Liability Period in the Construction Contract: Lessons Learnt from an Institution of Higher Education (IOHE) Building Project (IR). 2015.
警告:这些引文格式不一定是100%准确.