Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR)
Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DL...
Saved in:
Main Author: | |
---|---|
Format: | thesis |
Language: | eng |
Published: |
2015
|
Subjects: | |
Online Access: | https://ir.upsi.edu.my/detailsg.php?det=1271 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
oai:ir.upsi.edu.my:1271 |
---|---|
record_format |
uketd_dc |
spelling |
oai:ir.upsi.edu.my:12712020-02-27 Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) 2015 Fait Hanapi LB2300 Higher Education Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DLP) that has been provided in the contract completely and clearly enough how it is governed. The weakness in the governing DLP will give negative impact on the users of the building and would be detrimental to t 2015 thesis https://ir.upsi.edu.my/detailsg.php?det=1271 https://ir.upsi.edu.my/detailsg.php?det=1271 text eng closedAccess Masters Universiti Pendidikan Sultan Idris Fakulti Sains Kemanusiaan N/A |
institution |
Universiti Pendidikan Sultan Idris |
collection |
UPSI Digital Repository |
language |
eng |
topic |
LB2300 Higher Education |
spellingShingle |
LB2300 Higher Education Fait Hanapi Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
description |
Construction projects are often given serious attention at early stage, but less emphasize on the Defect Liability Period (DLP). Most parties consider the defect liability period are things that are not important and does not affect the overall performance of the project. Defect liability period (DLP) that has been provided in the contract completely and clearly enough how it is governed. The weakness in the governing DLP will give negative impact on the users of the building and would be detrimental to t |
format |
thesis |
qualification_name |
|
qualification_level |
Master's degree |
author |
Fait Hanapi |
author_facet |
Fait Hanapi |
author_sort |
Fait Hanapi |
title |
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
title_short |
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
title_full |
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
title_fullStr |
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
title_full_unstemmed |
Defect liability period in the construction contract: lessons learnt from an institution of higher education (IOHE) building project (IR) |
title_sort |
defect liability period in the construction contract: lessons learnt from an institution of higher education (iohe) building project (ir) |
granting_institution |
Universiti Pendidikan Sultan Idris |
granting_department |
Fakulti Sains Kemanusiaan |
publishDate |
2015 |
url |
https://ir.upsi.edu.my/detailsg.php?det=1271 |
_version_ |
1747832962589655040 |