Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage : the relationship with project performance /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2015.
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/5852/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01447cam a2200349 i 4500 | ||
|---|---|---|---|
| 001 | u1019175 | ||
| 003 | SIRSI | ||
| 005 | 201507311035 | ||
| 008 | 150731s2015 my a m 000 0 eng | ||
| 040 | |a UMM |d AUM |e rda | ||
| 090 | |a TH145 |b UMP 2015 Won | ||
| 100 | 1 | |a Wong, Phui Fung, |e author. | |
| 245 | 1 | 0 | |a Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage : |b the relationship with project performance / |c Wong Phui Fung. |
| 264 | 1 | |c 2015. | |
| 264 | 4 | |c 2015. | |
| 300 | |a xix, 312 leaves : |b illustrations ; |c 30 cm. | ||
| 336 | |a text |2 rdacontent | ||
| 337 | |a unmediated |2 rdamedia | ||
| 338 | |a volume |2 rdacarrier | ||
| 502 | |b Ph.D |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya |d 2015. | ||
| 504 | |a Bibliography: leaves 255-293. | ||
| 530 | |a Also issued in CD. | ||
| 650 | 0 | |a Building information modeling. | |
| 650 | 0 | |a Building |x Estimates. | |
| 650 | 0 | |a Quantity surveying. | |
| 650 | 0 | |a Construction industry |x Management. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
| 856 | 4 | 1 | |u http://studentsrepo.um.edu.my/5852/ |
| 900 | |a NSR NSM | ||
| 596 | |a 1 25 | ||
| 999 | |a TH145 UMP 2015 WON |w LC |c 1 |i A516239052 |d 1/10/2018 |e 1/10/2018 |f 25/11/2016 |g 1 |l STACKS |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 23/11/2016 |1 STEM | ||
| 999 | |a TH145 UMP 2015 WON |w LC |c 1 |i A516238984 |d 16/10/2018 |f 16/10/2018 |g 1 |l STACKS |m P25UMARCHI |r N |s Y |t CD |u 16/10/2018 |1 STEM | ||
