Integration in construction project teams and its effects on project performance /

Saved in:
Bibliographic Details
Main Author: Nazira Lokman (Author)
Format: Thesis Book
Language:English
Published: 2016.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01117cam a2200301 i 4500
001 u1102386
003 SIRSI
005 201812141145
008 181214s2016 my a t 000 0 eng m
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a TH435  |b UM 2016 Nazl 
100 0 |a Nazira Lokman.,  |e author 
245 1 0 |a Integration in construction project teams and its effects on project performance /  |c Nazira binti Lokman. 
264 1 |c 2016. 
264 4 |c  2016. 
300 |a xvii, 120 leaves :  |b illustrations ;  |c 30 cm + 1 computer disc ;  |c 12 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
502 |b M.Sc (Project Mgmt.)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya,  |d 2016. 
504 |a Bibliography: leaves 103-111. 
650 0 |a Construction industry  |x Management  |z Malaysia. 
650 0 |a Project management. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a TH435 UM 2016 NAZL  |w LC  |c 1  |i A517156270  |f 2/4/2019  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 2/4/2019  |1 STEM