Inclusion of quality variables in earned value management to facilitate triple constraints assessment for the construction industry in Malaysia /
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة كتاب |
| اللغة: | English |
| منشور في: |
2018.
|
| الموضوعات: | |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| LEADER | 01412cam a2200337 i 4500 | ||
|---|---|---|---|
| 001 | u1107120 | ||
| 003 | SIRSI | ||
| 005 | 201902261640 | ||
| 008 | 190226s2018 my a t 000 0 eng | ||
| 040 | |a UMAB |e rda | ||
| 043 | |a a-my--- | ||
| 097 | |a TH435 |b UMP 2018 Ong | ||
| 100 | 1 | |a Ong, Hong Yeow. |e author | |
| 245 | 1 | 0 | |a Inclusion of quality variables in earned value management to facilitate triple constraints assessment for the construction industry in Malaysia / |c Ong Hong Yeow. |
| 264 | 1 | |c 2018. | |
| 264 | 4 | |c 2018. | |
| 270 | 1 | |g Nurshuhada Zainon. |a Universiti Malaya. Fakulti Alam Bina. Jabatan Ukur Bahan. | |
| 300 | |a xv, 260 leaves : |b illustrations ; |c 30 cm + |e 1 computer optical disc (4 3/4 in.) | ||
| 336 | |a text |2 rdacontent | ||
| 337 | |a unmediated |2 rdamedia | ||
| 338 | |a volume |2 rdacarrier | ||
| 502 | |a Thesis (Ph.D) Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, |d 2018. | ||
| 504 | |a Bibliography: leaves 231-249. | ||
| 650 | 0 | |a Industrial management. | |
| 650 | 0 | |a Value analysis (Cost control) | |
| 650 | 0 | |a Construction industry |z Malaysia. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
| 900 | |a HF | ||
| 596 | |a 11 | ||
| 999 | |a TH435 UMP 2018 ONG |w LC |c 1 |i A517364153 |f 16/8/2019 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 16/8/2019 | ||
| 999 | |a TH435 UMP 2018 ONG |w LC |c 2 |i A517364175 |f 16/8/2019 |g 1 |l COUNTER |m P11ALMBINA |r Y |s Y |t CD |u 16/8/2019 | ||
