Factors affecting project cost overrun under Ministry of Defence throughout construction project lifecycle /

Saved in:
Bibliographic Details
Main Author: Mohd Nadzeef Ab. Malek (Author)
Format: Thesis Book
Language:English
Published: 2020.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01347cam a2200349 i 4500
001 u1135745
003 SIRSI
005 202007291006
008 200729s2020 my a m 000 0 eng
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a TH435  |b UM 2020 Mohnam 
100 0 |a Mohd Nadzeef Ab. Malek.,  |e author. 
245 1 0 |a Factors affecting project cost overrun under Ministry of Defence throughout construction project lifecycle /  |c Mohd Nadzeef bin Ab. Malek. 
264 1 |c 2020. 
264 4 |c  2020. 
300 |a xiv, 138 leaves :  |b illustrations ;  |c 30 cm. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 |a Also issued in CD. 
502 |b M.(P.Mgmt)  |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya  |d 2020. 
504 |a Bibliography :  |b leaves 112-119. 
650 0 |a Construction industry  |x Management. 
650 0 |a Construction industry  |z Malaysia. 
650 0 |a Project management. 
650 0 |a Product life cycle. 
710 2 |a Universiti Malaya.  |b Jabatan Ukur Bahan,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a TH435 UM 2020 MOHNAM  |w LC  |c 1  |i A517371517  |f 28/12/2020  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 16/10/2020 
999 |a TH435 UM 2020 MOHNAM  |w LC  |c 2  |i A517358864  |f 19/3/2021  |g 1  |l COUNTER  |m P11ALMBINA  |r Y  |s Y  |t CD  |u 19/3/2021