Partial least square-structural equation modelling for implementation of integrated BIM in Malaysia construction industry /

Saved in:
Bibliographic Details
Main Author: Almashjary, Badr Mohammed Saeed (Author)
Format: Thesis Book
Language:English
Published: 2020.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01329nam a2200325 4500
001 u1139997
003 SIRSI
005 202012110958
008 201211s2020 my a m 000 0 eng d
040 |a UMAB  |e rda 
043 |a a-my--- 
097 |a NA2520  |b UM 2020 Alm 
100 1 |a Almashjary, Badr Mohammed Saeed.,  |e author 
245 1 0 |a Partial least square-structural equation modelling for implementation of integrated BIM in Malaysia construction industry /  |c Badr Mohammed Saeed Almashjary. 
264 1 |c 2020. 
264 4 |c  2020. 
300 |a xvii, 199 leaves :  |b illustrations ;  |c 30 cm +  |e 1 computer disk ;  |c 3 1/2 in. 
336 |a text  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 |a Also issued in CD. 
502 |b M.Sc(Architecture)  |c Jabatan Seni Bina, Fakulti Alam Bina, Universiti Malaya  |d 2020. 
504 |a Bibliography :  |b leaves 167-182. 
650 0 |a Building information modeling. 
650 0 |a Construction industry  |z Malaysia. 
710 2 |a Universiti Malaya.  |b Jabatan Seni Bina,  |e degree granting institution. 
900 |a HF 
596 |a 11 
999 |a NA2520 UM 2020 ALM  |w LC  |c 1  |i A517160084  |f 17/2/2021  |g 1  |l STACKS  |m P11ALMBINA  |r Y  |s Y  |t TESIS  |u 11/12/2020 
999 |a NA2520 UM 2020 ALM  |w LC  |c 2  |i A517160053  |f 17/2/2021  |g 1  |l COUNTER  |m P11ALMBINA  |r Y  |s Y  |t CD  |u 17/2/2021