Determining the delay factors for reconstructed mega-project's phases and the associated challenges /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2021.
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/13998/ |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01694nam a2200397 i 4500 | ||
|---|---|---|---|
| 001 | u1150935 | ||
| 003 | SIRSI | ||
| 005 | 202112061147 | ||
| 008 | 211206s2021 my ac m 000 0 eng | ||
| 040 | |a UMM |d UMJ |d AUM |e rda | ||
| 090 | |a TA145 |b UMP 2021 Alk | ||
| 097 | |a TA145 |b UMP 2021 Alk | ||
| 100 | 1 | |a Al Khatib, Basem Adnan , |e author. | |
| 245 | 1 | 0 | |a Determining the delay factors for reconstructed mega-project's phases and the associated challenges / |c Basem Adnan Al Khatib. |
| 264 | 1 | |c 2021. | |
| 300 | |a xvi, 130 leaves : |b colour illustrations, portraits ; |c 30 cm | ||
| 336 | |a text |2 rdacontent | ||
| 336 | |a still image |2 rdacontent | ||
| 337 | |a unmediated |2 rdamedia | ||
| 337 | |a computer |2 rdamedia | ||
| 338 | |a volume |2 rdacarrier | ||
| 338 | |a computer disc |2 rdacarrier | ||
| 502 | |b Ph.D. |c Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya |d 2021. | ||
| 504 | |a Bibliography: leaves 114-118. | ||
| 530 | |a Also issued in CD. | ||
| 650 | 0 | |a Construction industry |x Management. | |
| 650 | 0 | |a Buildings |x Maintenance and repair. | |
| 650 | 0 | |a Civil engineering |x Research. | |
| 650 | 0 | |a Engineering |x Management. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam, |e degree granting institution. | |
| 856 | 4 | 1 | |u http://studentsrepo.um.edu.my/13998/ |
| 900 | |a NNANS US | ||
| 596 | |a 1 7 25 | ||
| 999 | |a TA145 UMP 2021 ALK |w LC |c 1 |i A517719109 |f 14/3/2022 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 14/3/2022 |1 STEM | ||
| 999 | |a TA145 UMP 2021 ALK |w LC |c 1 |i A517732723 |f 23/3/2022 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 23/3/2022 |1 STEM | ||
| 999 | |a TA145 UMP 2021 ALK |w LC |c 1 |i A517719112 |f 31/5/2022 |g 1 |l STACKS |m P25UMARCHI |r N |s Y |t CD |u 31/5/2022 |1 STEM |o .STAFF. MST-CD951 | ||
