Development of conceptual framework on the occupational stress for the construction projects management staff of China contractors /
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة كتاب |
| اللغة: | English |
| منشور في: |
2022.
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | http://studentsrepo.um.edu.my/14126/ |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| LEADER | 01687nam a2200397 i 4500 | ||
|---|---|---|---|
| 001 | u1153770 | ||
| 003 | SIRSI | ||
| 005 | 202203071017 | ||
| 008 | 220307s2022 my a m 000 0 eng | ||
| 040 | |a UMAB |e rda | ||
| 043 | |a a-cc--- | ||
| 097 | |a TH145 |b UM 2022 Yan | ||
| 100 | 1 | |a Yang, Zi Fan, |e author. | |
| 245 | 1 | 0 | |a Development of conceptual framework on the occupational stress for the construction projects management staff of China contractors / |c Yang Zi Fan. |
| 264 | 1 | |c 2022. | |
| 300 | |a xii, 87 leaves : |b illustrations ; |c 30 cm | ||
| 336 | |a text |2 rdacontent | ||
| 336 | |a still image |2 rdacontent | ||
| 337 | |a unmediated |2 rdamedia | ||
| 337 | |a computer |2 rdamedia | ||
| 338 | |a volume |2 rdacarrier | ||
| 338 | |a computer disc |2 rdacarrier | ||
| 502 | |b M.Sc.Project Mgmt. |c Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya |d 2022. | ||
| 504 | |a Bibliography: leaves 74-83. | ||
| 530 | |a Also issued in CD. | ||
| 650 | 0 | |a Contractors |x Job stress |z China. | |
| 650 | 0 | |a Construction industry |z China |x Management. | |
| 650 | 0 | |a Project management |z China. | |
| 650 | 0 | |a Quantity surveying |z China. | |
| 650 | 0 | |a Chinese |x Foreign countries. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Ukur Bahan, |e degree granting institution. | |
| 856 | 4 | 1 | |u http://studentsrepo.um.edu.my/14126/ |
| 900 | |a NNANS US | ||
| 596 | |a 11 | ||
| 999 | |a TH145 UM 2022 YAN |w LC |c 1 |i A517671763 |f 19/5/2022 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 7/3/2022 |0 FAB |1 AHSS |o .STAFF. Surat persetujuan dan cd disertakan. | ||
| 999 | |a TH145 UM 2022 YAN |w LC |c 2 |i A517671281 |f 19/5/2022 |g 1 |l COUNTER |m P11ALMBINA |r N |s Y |t CD |u 19/5/2022 |o .STAFF. kandungan tesis telah dimuatnaik ke dalam repositori-CD shadowed-SMS | ||
