Challenges in 5D BIM-Based among quantity surveyors in Malaysian Construction Industry /
Saved in:
Main Author: | Nur Nabilah Mohamed Faizal (Author) |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2022.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A critical study of BIM people resource challenges for BIM adoption in the Malaysian construction industry /
by: Edwin Terence Dominic
Published: (2022) -
Negligence by quantity surveyors
by: Zulkepli, Mohd. Afiq
Published: (2012) -
Building information modeling (BIM) capabilities in quantity surveying practice during pre-construction stage : the relationship with project performance /
by: Wong, Phui Fung
Published: (2015) -
Intangible benefits of building information modelling (BIM) in Malaysia construction industry /
by: Aidzil Adzahar Ahmad
Published: (2018) -
Partial least square-structural equation modelling for implementation of integrated BIM in Malaysia construction industry /
by: Almashjary, Badr Mohammed Saeed
Published: (2020)