A study on the cost overruns in Goverment Hospital Construction Project in Malaysia /
Saved in:
Main Author: | Jagathisvaran, Ramachandran (Author) |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2022.
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Building information modelling readiness level for Goverment Project in Malaysia /
by: Chong, Chee Ying
Published: (2021) -
Application of building information modelling in facilities management for goverment projects in Malaysia /
by: Mohd Faizarudin Mohd Noor
Published: (2021) -
Challenges to adopt circular economy in the Malaysian construction industry /
by: Asma'u Abdulwahab Muhammad
Published: (2022) -
Time and cost overrun of construction projects in Malaysia
by: Hassaniavarzaman, Mehdi
Published: (2013) -
Personnel satisfaction level on termite control service : a case study on RMAF base in Malaysia /
by: Shashi Kumar Sandhakumarin
Published: (2020)