Project management with problem contractors /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
1992.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 00840cam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | u346982 | ||
| 003 | SIRSI | ||
| 008 | 940127s1992 si v 00 1 eng m | ||
| 035 | |a ABR-8063 | ||
| 040 | |a UMM | ||
| 043 | |a a-si--- |a a-hk--- | ||
| 090 | |a HD9715 |b S552Kon | ||
| 100 | 1 | 0 | |a Kong, Wilfred Kang-Fai. |
| 245 | 1 | 0 | |a Project management with problem contractors / |c by Kong Kang-Fai, Wlifred. |
| 260 | |c 1992. | ||
| 300 | |a xi, 131 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Sc.) -- National University of Singapore, 1992. | ||
| 504 | |a Bibliography: leaves 77-79. | ||
| 650 | 0 | |a Construction industry |z Singapore |x Management. | |
| 650 | 0 | |a Construction industry |z Hong Kong |x Management. | |
| 948 | |a 27/01/1994 |b 17/08/1998 | ||
| 596 | |a 1 | ||
| 999 | |a F HD9715 S552KON |w LC |c 1 |i A504524992 |d 28/6/2000 |l STACKS |m P01UTAMA |n 4 |r Y |s Y |t TESIS |u 3/3/1994 | ||
