`Just-in-time' (JIT) concept to improving productivity in the construction industry : an exploratory study in prefabrication /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
1994.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 00988cam a2200265 a 4500 | ||
|---|---|---|---|
| 001 | u366238 | ||
| 003 | SIRSI | ||
| 008 | 950110s1994 si v 00 1 eng m | ||
| 035 | |a ABU-8746 | ||
| 040 | |a UMM | ||
| 043 | |a a-si--- | ||
| 090 | |a TS157.4 |b Cha | ||
| 100 | 1 | 0 | |a Chan, Yue Meng. |
| 245 | 1 | 0 | |a `Just-in-time' (JIT) concept to improving productivity in the construction industry : |b an exploratory study in prefabrication / |c by Chan Yue Meng. |
| 260 | |c 1994. | ||
| 300 | |a xi, 200 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Sc.) -- National University of Singapore, 1994. | ||
| 504 | |a Bibliography: leaves 196-200. | ||
| 650 | 0 | |a Just-in-time systems. | |
| 650 | 0 | |a Construction industry |x Production control |z Singapore. | |
| 650 | 0 | |a Construction industry |x Production control. | |
| 650 | 0 | |a Buildings, Prefabricated. | |
| 948 | |a 10/01/1995 |b 15/08/2002 | ||
| 596 | |a 1 | ||
| 999 | |a TS157.4 CHA |w LC |c 1 |i A505808595 |d 27/9/2011 |e 11/8/2009 |l STACKS |m P01UTAMA |n 33 |r Y |s Y |t TESIS |u 17/3/1995 | ||
