Financial feasibility study on the construction of Changi Airport Terminal 3 using build-operate-transfer (BOT) financing scheme /
Saved in:
Main Author: | Ramanathan Ramanathan |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1995
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Cost control of Terminal II construction : Changi Airport /
by: Tsang, Alan Chi Kin
Published: (1991) -
The economic of airport development and control /
by: Fitzgerald, E. V. K. 1947-
Published: (1973) -
Retrofitting of airport terminal buildings /
by: Han, Edward Fung Siew
Published: (1994) -
Maintenance and operation of Baggage Handling System (BHS) and Terminal Transit System (TTS) at KLIA airport / Khairul Anuar Razali
by: Razali, Khairul Anuar
Published: (2007) -
Developing critical success factors (CSFs) of value management (VM) workshop for the Malaysia Airports Holdings Berhad (MAHB) / Syamsul Azuar Arshad
by: Arshad, Syamsul Azuar
Published: (2022)