Evolving construction schedules under resource constraints /

Saved in:
Bibliographic Details
Main Author: Govindan, Kannan
Format: Thesis Book
Language:English
Published: 1995.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 00804cam a2200241 a 4500
001 u388480
003 SIRSI
008 951124s1995 si v 00 1 eng m
035 |a ABY-4601 
040 |a UMM 
090 |a TS157.5  |b Gov 
100 1 0 |a Govindan, Kannan. 
245 1 0 |a Evolving construction schedules under resource constraints /  |c by Kannan Govindan. 
260 |c 1995. 
300 |a xii, 139 leaves :  |b ill. ;  |c 30 cm. 
502 |a Dissertation (M.Eng.) -- National University of Singapore, 1995. 
504 |a Bibliography: leaves 127-133. 
650 0 |a Production scheduling  |x Mathematical models. 
650 0 |a Project management. 
650 0 |a Heuristic programming. 
948 |a 24/11/1995  |b 05/11/2001 
596 |a 1 
999 |a F TS157.5 GOV  |w LC  |c 1  |i A505347397  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 8/4/1996