Evolving construction schedules under resource constraints /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1995.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00804cam a2200241 a 4500 | ||
---|---|---|---|
001 | u388480 | ||
003 | SIRSI | ||
008 | 951124s1995 si v 00 1 eng m | ||
035 | |a ABY-4601 | ||
040 | |a UMM | ||
090 | |a TS157.5 |b Gov | ||
100 | 1 | 0 | |a Govindan, Kannan. |
245 | 1 | 0 | |a Evolving construction schedules under resource constraints / |c by Kannan Govindan. |
260 | |c 1995. | ||
300 | |a xii, 139 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- National University of Singapore, 1995. | ||
504 | |a Bibliography: leaves 127-133. | ||
650 | 0 | |a Production scheduling |x Mathematical models. | |
650 | 0 | |a Project management. | |
650 | 0 | |a Heuristic programming. | |
948 | |a 24/11/1995 |b 05/11/2001 | ||
596 | |a 1 | ||
999 | |a F TS157.5 GOV |w LC |c 1 |i A505347397 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 8/4/1996 |