An investigation of design, time and variation provisions under the North-East line conditions of contract /
Saved in:
主要作者: | Ee, Benjamin Seck Yong |
---|---|
格式: | Thesis 圖書 |
語言: | English |
出版: |
1998.
|
主題: | |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
相似書籍
-
On-line rescheduling of rapid transit systems : a fuzzy expert system approach /
由: Thia, Boon Sing
出版: (1995) -
Harmonic analysis of railway systems /
由: Monchai Saitanaporn
出版: (1994) -
Public sector standard conditions of contract for construction works : its application in private sector Singapore /
由: Lim, Mackay Kah Chye
出版: (1998) -
The 1980 SIA standard forms of building contract : an improvement over the U.K. RIBA/JCT standard forms? /
由: Yan, Francis Mang Yan
出版: (1997) -
The viability of taxi as an alternative means of public transport : the Singapore case /
由: Lim, Kim Kwang
出版: (1995)