Environmental accounting and cost benefit analysis for major infrastructure projects as applied to the Malaysian context : analytical method development /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
1998.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01276cam a2200289 a 4500 | ||
|---|---|---|---|
| 001 | u429607 | ||
| 003 | SIRSI | ||
| 008 | 940809s1998 my a t 00 1 eng m | ||
| 035 | |a ACF-8322 | ||
| 040 | |a UMM | ||
| 090 | |a TK1513 |b M4Pra | ||
| 091 | |a Microfiche 14893 | ||
| 100 | 0 | 0 | |a P. Ragubathy P. R. |
| 245 | 1 | 0 | |a Environmental accounting and cost benefit analysis for major infrastructure projects as applied to the Malaysian context : |b analytical method development / |c P. Ragubathy P.R. |
| 260 | |c 1998. | ||
| 300 | |a v, 71 leaves : |b ill. ; |c 29 cm. | ||
| 500 | |a Microfiche. Kuala Lumpur : University of Malaya Library, 2000. 1 fiche : negative ; 11 x 15 cm. | ||
| 502 | |a Dissertation (M.B.A) -- Fakulti Perniagaan dan Perakaunan, Universiti Malaya, 1998. | ||
| 504 | |a Bibliography: leaves 67-71. | ||
| 610 | 2 | 0 | |a Bakun Hydroelectric Project. |
| 650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Sarawak. | |
| 650 | 0 | |a Hydroelectric power plants |z Sarawak |x Cost effectivness. | |
| 650 | 0 | |a Environmental auditing |z Malaysia |x Methodology. | |
| 710 | 2 | 0 | |a Universiti Malaya. |b Fakulti Perniagaan dan Perakaunan. |
| 948 | |a 30/09/1998 |b 17/06/2002 | ||
| 596 | |a 1 | ||
| 999 | |a TK1513 M4PRA |w LC |c 1 |i A508303642 |d 22/3/2011 |e 22/3/2011 |l STACKS |m P01UTAMA |n 8 |r Y |s Y |t TESIS |u 10/11/1998 | ||
