Building process modelling using product modelling methodology and its application to scheduling /
Saved in:
| 主要作者: | |
|---|---|
| 格式: | Thesis 图书 |
| 语言: | English |
| 出版: |
1998.
|
| 主题: | |
| 标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
| LEADER | 00882cam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | u430341 | ||
| 003 | SIRSI | ||
| 008 | 981015s1998 si v 00 1 eng m | ||
| 035 | |a ACF-9292 | ||
| 040 | |a UMM | ||
| 090 | |a TH438.4 |b Zho | ||
| 100 | 1 | 0 | |a Zhong, Qi. |
| 245 | 1 | 0 | |a Building process modelling using product modelling methodology and its application to scheduling / |c by Zhong Qi. |
| 260 | |c 1998. | ||
| 300 | |a xi, 205 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Thesis (Ph.D.) -- National University of singapore, 1998. | ||
| 504 | |a Bibliography: leaves 145-154. | ||
| 650 | 0 | |a Construction industry |x Management |x Data processing. | |
| 650 | 0 | |a Building |x Data processing. | |
| 650 | 0 | |a Production scheduling |x Mathematical models. | |
| 948 | |a 15/10/1998 |b 15/02/1999 | ||
| 596 | |a 1 | ||
| 999 | |a TH438.4 ZHO |w LC |c 1 |i A508249685 |d 18/10/2007 |e 18/10/2007 |l STACKS |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 19/2/1999 | ||
