Application of cost significance technique to time and cost control of construction projects /
محفوظ في:
| المؤلف الرئيسي: | |
|---|---|
| التنسيق: | أطروحة كتاب |
| اللغة: | English |
| منشور في: |
1995.
|
| الموضوعات: | |
| الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| LEADER | 00866cam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | u436497 | ||
| 003 | SIRSI | ||
| 008 | 990313s1995 si v 00 1 eng m | ||
| 035 | |a ACG-7763 | ||
| 040 | |a UMM | ||
| 090 | |a HD9715 |b A2Sin | ||
| 100 | 1 | 0 | |a Sin, Wai Meng |
| 245 | 1 | 0 | |a Application of cost significance technique to time and cost control of construction projects / |c by Sin Wai Meng. |
| 260 | |c 1995. | ||
| 300 | |a x, 128 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Sc.) -- National University of Singapore, 1995. | ||
| 504 | |a Bibliography: leaves 96-97. | ||
| 650 | 0 | |a Construction industry |x Management | |
| 650 | 0 | |a Construction industry |x Cost control | |
| 650 | 0 | |a Construction industry |x Production control. | |
| 948 | |a 15/03/1999 |b 22/03/1999 | ||
| 596 | |a 1 | ||
| 999 | |a HD9715 A2SIN |w LC |c 1 |i A508382030 |d 6/6/2001 |l STACKS |m P01UTAMA |n 6 |r Y |s Y |t TESIS |u 14/4/1999 | ||
