Wu, S. (1999). Integrating process planning and scheduling in distributed virtual manufacturing.
Chicago Style (17th ed.) CitationWu, Shaohong. Integrating Process Planning and Scheduling in Distributed Virtual Manufacturing. 1999.
MLA引文Wu, Shaohong. Integrating Process Planning and Scheduling in Distributed Virtual Manufacturing. 1999.
警告:这些引文格式不一定是100%准确.