The construction of university timetables by computer /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
1985
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00767cam a2200241 a 4500 | ||
---|---|---|---|
001 | u48829 | ||
003 | SIRSI | ||
008 | 860910s1985 si v 00 1 eng | ||
035 | |a AAF-2587 | ||
040 | |a UMM | ||
050 | 1 | |a LB2331 | |
090 | 0 | 0 | |a LB2331 |b Loo |
100 | 1 | 0 | |a Loo, E. H. |q (Ee Hian) |
245 | 1 | 4 | |a The construction of university timetables by computer / |c by E.H. Loo |
260 | |c 1985 | ||
300 | |a viii, 253 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Sc.) -- National University of Singapore, 1985 | ||
504 | 0 | 0 | |a Bibliography: leaves 50-51 |
650 | 0 | |a Universities and colleges |x Timetables | |
650 | 0 | |a Production scheduling. | |
948 | |a 16/03/1991 |b 23/11/1998 | ||
596 | |a 1 | ||
999 | |a LB2331 LOO |w LC |c 1 |i A002686508 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 14/4/1992 |