De Silva, E. N. D. (2000). Allocation of contingency and its management for contruction project cost in Singapore: A probabilistic approach using artificial neural networks.
توثيق أسلوب شيكاغو (الطبعة السابعة عشر)De Silva, E. N. D. Allocation of Contingency and Its Management for Contruction Project Cost in Singapore: A Probabilistic Approach Using Artificial Neural Networks. 2000.
توثيق جمعية اللغة المعاصرة MLA (الطبعة الثامنة)De Silva, E. N. D. Allocation of Contingency and Its Management for Contruction Project Cost in Singapore: A Probabilistic Approach Using Artificial Neural Networks. 2000.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.