Re-engineering of the quality assurance process using work study methodology /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2001
|
| Subjects: | |
| Online Access: | http://studentsrepo.um.edu.my/id/eprint/1401 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01247cam a2200313 a 4500 | ||
|---|---|---|---|
| 001 | u501140 | ||
| 003 | SIRSI | ||
| 008 | 930625s2001 my t eng | ||
| 035 | |a ACU-7277 | ||
| 040 | |a UMK |d UMM | ||
| 043 | |a a-my--- | ||
| 090 | |a HF1008 |b UM 2000 Chi | ||
| 098 | |a HF5630 |b UM 2000 Chi | ||
| 100 | 1 | 0 | |a Chia, Yew Hoong. |
| 245 | 1 | 0 | |a Re-engineering of the quality assurance process using work study methodology / |c Chia Yew Hoong. |
| 260 | |c 2001 | ||
| 300 | |a ix, 73, 11 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.B.A.) -- Fakulti Perniagaan dan Perakaunan, Universiti Malaya, 2001. | ||
| 504 | |a Bibliography: leaves 58-60. | ||
| 650 | 0 | |a Quality assurance |z Malaysia |x Case studies. | |
| 650 | 0 | |a Work measurement |z Malaysia |x Case studies. | |
| 610 | 2 | 0 | |a Motorola (M) Sdn. Bhd. |
| 710 | 2 | 0 | |a Universiti Malaya. |b Fakulti Perniagaan dan Perakaunan. |
| 856 | |f IARC:A511965449 |z Click Here for Abstract and Table of Contents | ||
| 856 | 4 | 1 | |u http://studentsrepo.um.edu.my/id/eprint/1401 |
| 948 | |a 14/06/2002 |b 30/06/2004 | ||
| 596 | |a 1 19 | ||
| 999 | |a HF1008 UM 2000 CHI |w LC |c 1 |i A510951214 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 12/2/2004 | ||
| 999 | |a HF5630 UM 2001 CHI |w LC |c 1 |i A508948287 |l STACKS |m P19KOTA |r Y |s Y |t TESIS |u 19/11/2002 | ||
