Scheduling of flexible-sequenced process plans in a mold manufacturing shop /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2001.
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00708cam a2200205 a 4500 | ||
---|---|---|---|
001 | u505164 | ||
003 | SIRSI | ||
008 | 020917s2001 si v 00 1 eng m | ||
035 | |a ACV-9320 | ||
040 | |a UMM | ||
090 | |a TJ7 |b NUS 2001 Gan | ||
100 | 1 | 0 | |a Gan, Pay Yap. |
245 | 1 | 0 | |a Scheduling of flexible-sequenced process plans in a mold manufacturing shop / |c by Gan Pay Yap. |
260 | |c 2001. | ||
300 | |a ix, 97 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- National University of Singapore, 2001. | ||
504 | |a Bibliography: leaves 88-97. | ||
948 | |a 10/10/2002 |b 08/11/2002 | ||
596 | |a 1 | ||
999 | |a TJ7 NUS 2001 GAN |w LC |c 1 |i A510891404 |l B_KOM4 |m P01UTAMA |r Y |s Y |t TESIS |u 2/12/2002 |o .PUBLIC. BKOM 4 : 45403 |