Quantitative risk assessment for the transport of ammonia by rail from Gurun to Port Klang /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01158nam a2200277 i 4500 | ||
---|---|---|---|
001 | u694676 | ||
003 | SIRSI | ||
008 | 910820s2003 my t 00 10 eng m | ||
035 | |a ADA-2945 | ||
040 | |a UMJ |d UMM |e rda | ||
090 | |a TP7 |b UM 2003 Puvb | ||
097 | |a TP7 |b UM 2003 Puvb | ||
100 | 0 | 0 | |a Puvaneswaran Balasubramaniam. |e author |
245 | 1 | 0 | |a Quantitative risk assessment for the transport of ammonia by rail from Gurun to Port Klang / |c Puvaneswaran a/l Balasubramaniam. |
264 | 1 | |c 2003. | |
264 | 4 | |c 2003 | |
300 | |a xiii, 200 leaves : |b ill. ; |c 28 cm. | ||
502 | |b M.Eng. |c Jabatan Kejuruteraan Kimia, Fakulti Kejuruteraan, Universiti Malaya |d 2003. | ||
650 | 0 | |a Hazardous substances |x Transportation. | |
650 | 0 | |a Biological monitoring |z Malaysia. | |
710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Kejuruteraan Kimia. |e degree granting institution |
948 | |a 12/02/2004 |b 12/02/2004 | ||
596 | |a 1 7 | ||
902 | |a 090 - 1 COPY (UMM) | ||
999 | |a TP7 UM 2003 PUVB |w LC |c 1 |i A511882136 |d 7/8/2008 |f 7/8/2008 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 1/8/2008 | ||
999 | |a TP7 UM 2003 PUVB |w LC |c 1 |i A511880665 |d 14/4/2016 |f 14/4/2016 |g 2 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 1/8/2008 |