Extensions of time in standard forms of construction contracts in Malaysia /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2005.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01084cam a2200241 a 4500 | ||
|---|---|---|---|
| 001 | u715654 | ||
| 003 | SIRSI | ||
| 008 | 051212s2005 my t 000 0 eng m | ||
| 040 | |a UMAB |d UMM | ||
| 090 | |a TH145 |b UM 2005 Lim | ||
| 097 | |a TH145 |b UM 2005 Lim | ||
| 100 | 1 | O | |a Lim, Chwee Chen |
| 245 | 1 | 0 | |a Extensions of time in standard forms of construction contracts in Malaysia / |c Lim Chwee Chen. |
| 260 | |c 2005. | ||
| 300 | |a xviii, 343 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Sc. (Building)) -- Jabatan Ukur Bangunan, Fakulti Alam Bina, Universiti Malaya, 2005. | ||
| 504 | |a Bibliography: Leaves 340-343. | ||
| 650 | 0 | |a Time management |z Malaysia |x Design and construction. | |
| 650 | 0 | |a Construction contracts |z Malaysia |x Management. | |
| 710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Ukur Bangunan. |
| 596 | |a 1 11 | ||
| 999 | |a TH145 UM 2005 LIM |w LC |c 1 |i A511827491 |d 16/11/2017 |e 16/11/2017 |f 20/12/2005 |g 1 |l STACKS |m P11ALMBINA |n 4 |r Y |s Y |t TESIS |u 20/12/2005 |1 STEM | ||
| 999 | |a TH145 UM 2005 LIM |w LC |c 1 |i A511827526 |d 25/3/2018 |e 25/3/2018 |f 22/8/2006 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 22/8/2006 | ||
