Approaches in continual improvement of an ISO 14001 improvemental management system at Tuanku Ja'afar Steam Power Station, Port Dickson, Negeri Sembilan /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2004.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01014cam a2200229 a 4500 | ||
|---|---|---|---|
| 001 | u724309 | ||
| 003 | SIRSI | ||
| 005 | 200607131627 | ||
| 008 | 060713s2004 my t 000 0 eng m | ||
| 040 | |a UMM | ||
| 090 | |a GE7 |b UM 2004 Khani | ||
| 100 | 0 | 0 | |a Khairul Nadiah Ibrahim |
| 245 | 1 | 0 | |a Approaches in continual improvement of an ISO 14001 improvemental management system at Tuanku Ja'afar Steam Power Station, Port Dickson, Negeri Sembilan / |c Khairul Nadiah bte Ibrahim. |
| 260 | |c 2004. | ||
| 300 | |a xiv, 153 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Tech. (Envir. Mgmt.)) -- Institut Sains Biologi, Fakulti Sains, Universiti Malaya, 2005. | ||
| 504 | |a Bibliography: leaves 99-105. | ||
| 650 | 0 | |a Environmental management |z Negeri Sembilan |z Port Dickson |x Quality control. | |
| 650 | 0 | |a ISO 14001 Standard. | |
| 710 | 2 | 0 | |a Universiti Malaya. |b Institut Sains Biologi. |
| 596 | |a 1 | ||
| 999 | |a GE7 UM 2004 KHANI |w LC |c 1 |i A511940288 |d 5/2/2008 |e 5/2/2008 |f 22/8/2006 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 22/8/2006 | ||
