Determination of critical cultural factors in selected construction projects /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2006.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01099cam a2200277 a 4500 | ||
---|---|---|---|
001 | u736299 | ||
003 | SIRSI | ||
005 | 200704051615 | ||
008 | 070405s2006 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ | ||
090 | |a TA145 |b UM 2006 Wan | ||
097 | |a TA145 |b UM 2006 Wan | ||
100 | 1 | |a Wang, Chen. | |
245 | 1 | 0 | |a Determination of critical cultural factors in selected construction projects / |c Wang Chen. |
260 | |c 2006. | ||
300 | |a x, 211 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.Sc.) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2006. | ||
504 | |a Bibliography: leaves 167-188. | ||
650 | 0 | |a Construction industry |x Finance. | |
650 | 0 | |a Engineering |x Management. | |
650 | 0 | |a Building |x Cost control. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam. | |
596 | |a 1 7 | ||
900 | |a SJMK | ||
999 | |a TA145 UM 2006 WAN |w LC |c 1 |i A512900015 |d 15/8/2015 |e 15/8/2015 |f 2/10/2007 |g 1 |l STACKS |m P01UTAMA |n 3 |r Y |s Y |t TESIS |u 1/10/2007 | ||
999 | |a TA145 UM 2006 WAN |w LC |c 1 |i A513004134 |d 18/8/2008 |f 18/8/2008 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 15/8/2008 |