Probabilistic elemental cost modelling for building construction in Malaysia /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2007.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01064cam a2200265 a 4500 | ||
---|---|---|---|
001 | u746040 | ||
003 | SIRSI | ||
005 | 200709251044 | ||
008 | 070925s2007 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ | ||
090 | |a TA145 |b UMP 2007 Ng | ||
097 | |a TA145 |b UMP 2007 Ng | ||
100 | 1 | |a Ng, Chee Hock. | |
245 | 1 | 0 | |a Probabilistic elemental cost modelling for building construction in Malaysia / |c Ng Chee Hock. |
260 | |c 2007. | ||
300 | |a xvii, 342 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Thesis (Ph.D.) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2007. | ||
504 | |a Bibliography: leaves 267-282. | ||
650 | 0 | |a Construction industry |x Costs |x Mathematical models. | |
650 | 0 | |a Buildings |x estimates. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam. | |
900 | |a SK | ||
596 | |a 1 7 | ||
999 | |a TA145 UMP 2007 |w LC |c 1 |i A513118164 |d 24/8/2009 |e 24/8/2009 |f 28/9/2007 |g 1 |l STACKS |m P01UTAMA |n 9 |r Y |s Y |t TESIS |u 28/9/2007 | ||
999 | |a TA145 UMP 2007 |w LC |c 1 |i A513001600 |d 7/8/2008 |f 7/8/2008 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 15/4/2008 |