Effect of lot size on cycle time for semiconductor back-end manufacturing : a simulation approach /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2006.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 00992cam a2200241 a 4500 | ||
---|---|---|---|
001 | u767155 | ||
003 | SIRSI | ||
005 | 200903161302 | ||
008 | 090316s2006 my t 000 0 eng m | ||
040 | |a UMM | ||
090 | |a TS176 |b UM 2006 Ton | ||
100 | 1 | |a Tong, Douglas Kum Tien. | |
245 | 1 | 0 | |a Effect of lot size on cycle time for semiconductor back-end manufacturing : |b a simulation approach / |c Douglas Tong Kum Tien. |
260 | |c 2006. | ||
300 | |a vii, 61, [25] leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Eng.) -- Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, 2007. | ||
504 | |a Bibliography: leaves 58-61. | ||
650 | 0 | |a Semiconductors |x Design and construction. | |
650 | 0 | |a Semiconductor industry. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
596 | |a 1 | ||
900 | |a ND-ZA | ||
999 | |a TS176 UM 2006 TON |w LC |c 1 |i A513003340 |d 6/11/2017 |e 6/11/2017 |f 16/3/2010 |g 1 |l STACKS |m P01UTAMA |n 3 |r Y |s Y |t TESIS |u 16/3/2010 |