Design and development of knowledge-based algorithm for disk scheduling policy using fuzzy logic /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2010.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01114cam a2200277 a 4500 | ||
|---|---|---|---|
| 001 | u830814 | ||
| 003 | SIRSI | ||
| 005 | 201106081159 | ||
| 008 | 110608s2010 my a v 000 0 eng m | ||
| 040 | |a UMM | ||
| 090 | |a QA9.64 |b Mohsat | ||
| 100 | 0 | |a Mohamad Sofian Abu Talip. | |
| 245 | 1 | 0 | |a Design and development of knowledge-based algorithm for disk scheduling policy using fuzzy logic / |c Mohamad Sofian bin Abu Talip. |
| 260 | |c 2010. | ||
| 270 | 1 | |g Mohamad Sofian Abu Talip. |a Universiti Malaya. Fakulti Kejuruteraan. Jabatan Kejuruteraan Elektrik. | |
| 300 | |a xiv, 140 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Sc.(Comp.Eng.)) -- Kulliyah of Engineering, International Islamic University Malaysia, 2010. | ||
| 504 | |a Bibliography: leaves 74-78. | ||
| 630 | 0 | 0 | |a MATLAB. |
| 650 | 0 | |a Fuzzy logic. | |
| 650 | 0 | |a Engineering mathematics. | |
| 650 | 0 | |a Computer algorithms. | |
| 710 | 2 | |a International Islamic University Malaysia. |b Kulliyah of Engineering. | |
| 900 | |a NHS | ||
| 596 | |a 1 | ||
| 999 | |a QA9.64 MOHSAT |w LC |c 1 |i A514402586 |d 21/11/2011 |f 21/11/2011 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 21/11/2011 | ||
