Lean construction in managing construction projects process waste : establishing a preliminary framework /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2011.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01270cam a2200301 a 4500 | ||
---|---|---|---|
001 | u839176 | ||
003 | SIRSI | ||
005 | 201109191115 | ||
008 | 110919s2011 my a t 000 0 eng m | ||
040 | |a UMM |d UMAB | ||
043 | |a a-my--- | ||
090 | |a TH145 |b UM 2011 Lim | ||
097 | |a TH145 |b UM 2011 Lim | ||
100 | 1 | |a Lim, Irene Yen Wui. | |
245 | 1 | 0 | |a Lean construction in managing construction projects process waste : |b establishing a preliminary framework / |c Irene Lim Yen Wui. |
260 | |c 2011. | ||
300 | |a [1] xv, 196 leaves : |b ill. ; |c 30 cm. | ||
502 | |a Dissertation (M.Sc.(Building)) -- Jabatan Ukur Bahan, Fakulti Alam Bina, Universiti Malaya, 2011. | ||
504 | |a Bibliography: leaves 163-174. | ||
650 | 0 | |a Construction industry |x Waste minimization |z Malaysia. | |
650 | 0 | |a Lean manufacturing |z Malaysia. | |
650 | 0 | |a Construction industry |x Management |z Malaysia. | |
650 | 0 | |a Construction industry |z Malaysia |x Cost control. | |
710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Ukur Bahan. |
900 | |a ZA | ||
596 | |a 1 11 | ||
999 | |a TH145 UM 2011 LIM |w LC |c 1 |i A514880626 |d 8/10/2015 |e 8/10/2015 |f 5/1/2012 |g 1 |l STACKS |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 4/1/2012 | ||
999 | |a TH145 UM 2011 LIM |w LC |c 1 |i A514880612 |d 11/6/2012 |f 11/6/2012 |g 1 |l STACKS |m P11ALMBINA |r Y |s Y |t TESIS |u 11/6/2012 |