Lean construction systems & tools in improving operational performance /
Saved in:
| 主要作者: | |
|---|---|
| 格式: | Thesis 图书 |
| 语言: | English |
| 出版: |
2010.
|
| 主题: | |
| 在线阅读: | http://studentsrepo.um.edu.my/id/eprint/1192 |
| 标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
| LEADER | 01394cam a2200325 a 4500 | ||
|---|---|---|---|
| 001 | u841419 | ||
| 003 | SIRSI | ||
| 005 | 201110201413 | ||
| 008 | 111020s2010 my a t 000 0 eng m | ||
| 040 | |a UMM |d UMK |d AUM |e rda | ||
| 090 | |a HF1008 |b UM 2010 Ng | ||
| 098 | |a HF1008 |b UM 2010 Ng | ||
| 100 | 1 | |a Ng, Jing Peng. | |
| 245 | 1 | 0 | |a Lean construction systems & tools in improving operational performance / |c Ng Jing Peng. |
| 260 | |c 2010. | ||
| 300 | |a [1] v, 82 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.B.A.) -- Fakulti Perniagaan dan Perakaunan, Universiti Malaya, 2010. | ||
| 504 | |a Bibliography: leaves 77-78. | ||
| 530 | |a Also issued in CD. | ||
| 650 | 0 | |a Lean manufacturing. | |
| 650 | 0 | |a Construction industry |x Waste minimization. | |
| 650 | 0 | |a Construction industry |x Management. | |
| 650 | 0 | |a Construction industry |x Cost control. | |
| 710 | 2 | |a Universiti Malaya. |b Fakulti Perniagaan dan Perakaunan. | |
| 856 | 4 | 1 | |u http://studentsrepo.um.edu.my/id/eprint/1192 |
| 900 | |a NHS-ZA | ||
| 596 | |a 1 19 25 | ||
| 999 | |a HF1008 UM 2010 NG |w LC |c 1 |i A514712676 |d 5/10/2015 |e 5/10/2015 |f 2/4/2012 |g 1 |l STACKS |m P01UTAMA |n 1 |r Y |s Y |t TESIS |u 2/4/2012 | ||
| 999 | |a HF1008 UM 2010 NG |w LC |c 1 |i A514712645 |d 10/7/2012 |f 10/7/2012 |g 1 |l STACKS |m P19KOTA |r Y |s Y |t TESIS |u 5/7/2012 | ||
| 999 | |a HF1008 UM 2010 NG |w LC |c 1 |i A514712702 |d 12/10/2018 |f 12/10/2018 |g 1 |l STACKS |m P25UMARCHI |r Y |s Y |t CD |u 3/11/2017 |1 AHSS | ||
