A study of yield quantity discrepancy reduction in semi-conductor back-end process /
Saved in:
Main Author: | Allina Abdullah |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2011.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/3134 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Determining the relationship between cost of control and project management success in building construction /
by: Al-Tmeemy, Samiaah M. Hassen
Published: (2011) -
Survey on the adoption and implementation of cost of quality (COQ) reporting among manufacturing organizations in Malaysia /
by: Murugan Rasamanie
Published: (2010) -
Application of cost significance technique to time and cost control of construction projects /
by: Sin, Wai Meng
Published: (1995) -
Influence of design & tender processes towards cost overrun in Malaysia's building services projects /
by: Boudeville, Jacquelyne Anne
Published: (2022) -
Design science research as an approach to develop conceptual solutions for improving cost management in construction /
by: Mahanim Hanid
Published: (2014)