The accuracy of preliminary cost estimates in Public Works Department (PWD) of Peninsular Malaysia /
Saved in:
Main Author: | Mohd Azrai Azman |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2012.
|
Subjects: | |
Online Access: | http://studentsrepo.um.edu.my/id/eprint/3587 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Accuracy in design stage cost estimating /
by: Cheong, Pak Foong
Published: (1991) -
Design and cost management in the project process /
by: Lau, William Thiam You
Published: (1991) -
Standard guidelines for bill of quantities customised for building conservation works : the Malaysian context /
by: Lim, Yoke Mui
Published: (2017) -
Probabilistic elemental cost modelling for building construction in Malaysia /
by: Ng, Chee Hock
Published: (2007) -
Case studies on cost overrun in commercial development projects in the Klang Valley /
by: Oo, Boon Khim
Published: (2019)