Determining the relationship between cost of control and project management success in building construction /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
2011.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01343cam a2200289 i 4500 | ||
---|---|---|---|
001 | u861908 | ||
003 | SIRSI | ||
005 | 201208021623 | ||
008 | 120802s2011 my a m 000 0 eng m | ||
040 | |a UMM |b UMJ |e rda | ||
090 | |a TA145 |b UMP 2011 Alt | ||
097 | |a TA145 |b UMP 2011 Alt | ||
100 | 1 | |a Al-Tmeemy, Samiaah M. Hassen, |e author. | |
245 | 1 | 0 | |a Determining the relationship between cost of control and project management success in building construction / |c Samiaah M. Hassen Al-Tmeemy. |
260 | |c 2011. | ||
300 | |a xxi, 248 leaves, 2 unnumbered leaves : |b illustrations ; |c 30 cm. | ||
502 | |a Thesis (Ph.D) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2011. | ||
504 | |a Bibliography: leaves 196-224. | ||
650 | 0 | |a Building |x Cost control. | |
650 | 0 | |a Construction industry |x Cost control. | |
650 | 0 | |a Project management |x Cost control. | |
710 | 2 | 0 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam. |
900 | |a MZAR-ZA | ||
596 | |a 1 7 | ||
999 | |a TA145 UMP 2011 ALT |w LC |c 1 |i A515013018 |d 29/1/2013 |f 29/1/2013 |g 1 |l STACKS |m P07JURUTER |r Y |s Y |t TESIS |u 29/1/2013 | ||
999 | |a TA145 UMP 2011 ALT |w LC |c 2 |i A515013097 |d 29/1/2013 |f 29/1/2013 |g 1 |l COUNTER |m P07JURUTER |r Y |s Y |t CD |u 29/1/2013 | ||
999 | |a TA145 UMP 2011 ALT |w LC |c 1 |i A515044602 |d 11/8/2018 |e 11/8/2018 |f 6/3/2013 |g 1 |l STACKS |m P01UTAMA |n 11 |r Y |s Y |t TESIS |u 1/3/2013 |