Cleaner production options for a rubber production plant /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2012.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01252cam a2200289 a 4500 | ||
|---|---|---|---|
| 001 | u864839 | ||
| 003 | SIRSI | ||
| 005 | 201209191723 | ||
| 008 | 120919s2012 my a t 000 0 eng m | ||
| 040 | |a UMM |d UMJ | ||
| 090 | |a TD7 |b UM 2012 Kay | ||
| 097 | |a TD7 |b UM 2012 Kay | ||
| 100 | 0 | |a Kayelvily Sadaiyandy. | |
| 245 | 1 | 0 | |a Cleaner production options for a rubber production plant / |c Kayelvily a/p Sadaiyandy @ Gopal. |
| 260 | |c 2012. | ||
| 300 | |a x, 59 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Eng.) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2012. | ||
| 504 | |a Bibliography: leaves 53-55. | ||
| 596 | |a 1 7 | ||
| 650 | 0 | |a Production management |x Environmental aspects. | |
| 650 | 0 | |a Rubber industry and trade |x Environmental aspects. | |
| 650 | 0 | |a Waste minimization. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam. | |
| 900 | |a US-ZA | ||
| 999 | |a TD7 UM 2012 KAY |w LC |c 1 |i A515285679 |d 27/11/2022 |e 27/11/2022 |f 6/3/2013 |g 1 |l STACKS |m P01UTAMA |n 2 |r Y |s Y |t TESIS |u 1/3/2013 | ||
| 999 | |a TD7 UM 2012 KAY |w LC |c 1 |i A515834217 |d 27/6/2014 |f 27/6/2014 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 27/5/2014 | ||
| 999 | |a TD7 UM 2012 KAY |w LC |c 2 |i A515839466 |d 27/6/2014 |f 27/6/2014 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 27/6/2014 | ||
