| LEADER | 01246cam a2200289 i 4500 | ||
|---|---|---|---|
| 001 | u864851 | ||
| 003 | SIRSI | ||
| 005 | 201209200935 | ||
| 008 | 120920s2012 my a m 000 0 eng m | ||
| 040 | |a UMM |d UMJ |e rda | ||
| 090 | |a TA7 |b UM 2012 Liu | ||
| 097 | |a TA7 |b UM 2012 Liu | ||
| 100 | 1 | |a Liu, Yang. | |
| 245 | 1 | 0 | |a Development of AGV real-time scheduling system / |c Liu Yang. |
| 264 | 1 | |c 2012. | |
| 300 | |a xiii, 138 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Dissertation (M.Eng.Sc.) -- Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, 2012. | ||
| 504 | |a Bibliography: leaves 121-126. | ||
| 596 | |a 1 7 | ||
| 650 | 0 | |a Automated guided vehicle systems. | |
| 650 | 0 | |a Automated guided vehicle systems |x Computer simulation. | |
| 650 | 0 | |a Real-time data processing. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
| 900 | |a AT-ZA | ||
| 999 | |a TA7 UM 2012 LIU |w LC |c 1 |i A515288454 |d 13/6/2013 |f 13/6/2013 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 12/6/2013 | ||
| 999 | |a TA7 UM 2012 LIU |w LC |c 1 |i A515832220 |d 10/9/2014 |f 10/9/2014 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 7/5/2014 | ||
| 999 | |a TA7 UM 2012 LIU |w LC |c 2 |i A515962437 |d 10/9/2014 |f 10/9/2014 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 10/9/2014 | ||
