Development of traffic parameter estimation using video and image processing /

Saved in:
Bibliographic Details
Main Author: Rad, Gholami Arash
Format: Thesis Book
Language:English
Published: 2012.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01205cam a2200289 a 4500
001 u867302
003 SIRSI
005 201210231025
008 121023s2012 my a t 000 0 eng m
040 |a UMM  |d UMJ 
090 |a TA145  |b UMP 2012 Rad 
097 |a TA145  |b UMP 2012 Rad 
100 1 |a Rad, Gholami Arash. 
245 1 0 |a Development of traffic parameter estimation using video and image processing /  |c Arash Gholami Rad. 
260 |c 2012. 
300 |a [i] xiv, 189 leaves :  |b ill. ;  |c 30 cm. 
502 |a Thesis (Ph.D) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2012. 
504 |a Bibliography: leaves 164-173. 
596 |a 1 7 
650 0 |a Traffic monitoring. 
650 0 |a Traffic flow  |x Measurement. 
650 0 |a Traffic patterns. 
710 2 |a Universiti Malaya.  |b Jabatan Kejuruteraan Awam. 
900 |a US-ZA 
999 |a TA145 UMP 2012 RAD  |w LC  |c 1  |i A515295906  |d 13/6/2013  |f 13/6/2013  |g 1  |l STACKS  |m P01UTAMA  |r Y  |s Y  |t TESIS  |u 13/6/2013 
999 |a TA145 UMP 2012 RAD  |w LC  |c 1  |i A515967068  |d 7/10/2014  |f 7/10/2014  |g 1  |l STACKS  |m P07JURUTER  |r N  |s Y  |t TESIS  |u 8/8/2014 
999 |a TA145 UMP 2012 RAD  |w LC  |c 2  |i A515963415  |d 7/10/2014  |f 7/10/2014  |g 1  |l COUNTER  |m P07JURUTER  |r N  |s Y  |t CD  |u 2/10/2014