Development of traffic parameter estimation using video and image processing /
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
2012.
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01205cam a2200289 a 4500 | ||
|---|---|---|---|
| 001 | u867302 | ||
| 003 | SIRSI | ||
| 005 | 201210231025 | ||
| 008 | 121023s2012 my a t 000 0 eng m | ||
| 040 | |a UMM |d UMJ | ||
| 090 | |a TA145 |b UMP 2012 Rad | ||
| 097 | |a TA145 |b UMP 2012 Rad | ||
| 100 | 1 | |a Rad, Gholami Arash. | |
| 245 | 1 | 0 | |a Development of traffic parameter estimation using video and image processing / |c Arash Gholami Rad. |
| 260 | |c 2012. | ||
| 300 | |a [i] xiv, 189 leaves : |b ill. ; |c 30 cm. | ||
| 502 | |a Thesis (Ph.D) -- Jabatan Kejuruteraan Awam, Fakulti Kejuruteraan, Universiti Malaya, 2012. | ||
| 504 | |a Bibliography: leaves 164-173. | ||
| 596 | |a 1 7 | ||
| 650 | 0 | |a Traffic monitoring. | |
| 650 | 0 | |a Traffic flow |x Measurement. | |
| 650 | 0 | |a Traffic patterns. | |
| 710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Awam. | |
| 900 | |a US-ZA | ||
| 999 | |a TA145 UMP 2012 RAD |w LC |c 1 |i A515295906 |d 13/6/2013 |f 13/6/2013 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 13/6/2013 | ||
| 999 | |a TA145 UMP 2012 RAD |w LC |c 1 |i A515967068 |d 7/10/2014 |f 7/10/2014 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 8/8/2014 | ||
| 999 | |a TA145 UMP 2012 RAD |w LC |c 2 |i A515963415 |d 7/10/2014 |f 7/10/2014 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 2/10/2014 | ||
