Fuzzy mixed production assembly line sequencing optimization model using multi objective dynamic fuzzy GA /
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01396cam a2200313 i 4500 | ||
---|---|---|---|
001 | u867307 | ||
003 | SIRSI | ||
005 | 201210231111 | ||
008 | 121023s2012 my a t 000 0 eng m | ||
040 | |a UMM |d UMJ |e rda | ||
090 | |a TS176 |b UMP 2012 Tah | ||
097 | |a TS176 |b UMP 2012 Tah | ||
100 | 1 | |a Tahriri, Farzad. | |
245 | 1 | 0 | |a Fuzzy mixed production assembly line sequencing optimization model using multi objective dynamic fuzzy GA / |c Farzad Tahriri. |
264 | 1 | |c 2012. | |
264 | 4 | |c 2012. | |
300 | |a xvii, 166 leaves : |b ill. ; |c 30 cm. | ||
502 | |b Ph.D |c Jabatan Kejuruteraan Rekabentuk dan Pembuatan, Fakulti Kejuruteraan, Universiti Malaya, |d 2012. | ||
504 | |a Bibliography: leaves 151-157. | ||
596 | |a 1 7 | ||
650 | 0 | |a Genetic algorithms |x Data processing. | |
650 | 0 | |a Industrial engineering. | |
650 | 0 | |a Fuzzy systems |x Industrial applications |x Mathematical models. | |
650 | 0 | |a Production scheduling |x Computer programs. | |
710 | 2 | |a Universiti Malaya. |b Jabatan Kejuruteraan Rekabentuk dan Pembuatan. | |
900 | |a US-ZA | ||
999 | |a TS176 UMP 2012 TAH |w LC |c 1 |i A515361145 |d 8/1/2014 |f 8/1/2014 |g 1 |l STACKS |m P01UTAMA |r Y |s Y |t TESIS |u 7/1/2014 | ||
999 | |a TS176 UMP 2012 TAH |w LC |c 1 |i A516152550 |d 18/3/2015 |f 18/3/2015 |g 1 |l STACKS |m P07JURUTER |r N |s Y |t TESIS |u 18/3/2015 | ||
999 | |a TS176 UMP 2012 TAH |w LC |c 2 |i A516156463 |d 18/3/2015 |f 18/3/2015 |g 1 |l COUNTER |m P07JURUTER |r N |s Y |t CD |u 18/3/2015 |